Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 1 LS of Traffic Control, 25 CY of excavation, 3175 SY of gravel street excavation, 6350 SY of otta seal, adjust valve box, adjust manhole, pavement markings. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This RFP is for the seal coating of multiple roads, utilizing various scrub and chip seal techniques.
Posted Date
Dec 9, 2025
Due Date
Dec 23, 2025
Release: Dec 9, 2025
Close: Dec 23, 2025
This RFP is for the seal coating of multiple roads, utilizing various scrub and chip seal techniques.
AvailablePremium
Access the largest public sector contact database
Site improvements.
Posted Date
Sep 26, 2025
Due Date
Jan 7, 2026
Release: Sep 26, 2025
Close: Jan 7, 2026
Site improvements.
AvailableSite work, hardscape and landscape improvements.
Posted Date
Sep 10, 2025
Due Date
Dec 16, 2025
Release: Sep 10, 2025
Close: Dec 16, 2025
Site work, hardscape and landscape improvements.
AvailableProject includes the following Work: Furnish all labor, materials, equipment, and incidentals required and construct the improvements in their entirety as shown on the Plans and as specified herein. The Work may include, but is not necessarily limited to, the following: 1.the installation of tank site RTUs, pump station RTUs, and solenoid control valve RTUs throughout the Clinton - Bee Branch Water Distribution System 2.the installation of new single phase electric services at various RTU sites as indicated 3.miscellaneous appurtenances 4.mobilization & demobilization 5.items of construction work and/or materials not specifically addressed herein, but nonetheless required for a complete, operating, and acceptable installation of the work, shall be considered subsidiary to the lump sum bid item, and the cost thereof shall be included therein.
Posted Date
Sep 5, 2025
Due Date
Jan 15, 2026
Release: Sep 5, 2025
Close: Jan 15, 2026
Project includes the following Work: Furnish all labor, materials, equipment, and incidentals required and construct the improvements in their entirety as shown on the Plans and as specified herein. The Work may include, but is not necessarily limited to, the following: 1.the installation of tank site RTUs, pump station RTUs, and solenoid control valve RTUs throughout the Clinton - Bee Branch Water Distribution System 2.the installation of new single phase electric services at various RTU sites as indicated 3.miscellaneous appurtenances 4.mobilization & demobilization 5.items of construction work and/or materials not specifically addressed herein, but nonetheless required for a complete, operating, and acceptable installation of the work, shall be considered subsidiary to the lump sum bid item, and the cost thereof shall be included therein.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis