Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Waterline erosion control; 10 each as- directed pothole; 9,210 LF 12" DIP water main; 1,600 LF 12" c900 dr18 water main.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Waterline upgrades.
Posted Date
Oct 21, 2025
Due Date
Feb 2, 2026
Release: Oct 21, 2025
Close: Feb 2, 2026
Waterline upgrades.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes constructing a new 750 LF of 24" dia public waterline, relocating an existing fire hydrant and installing a new water service line including excavation, connection/reconnection to the existing public waterlines, backfilling, compacting, testing, restoring, bypassing and other work.
Posted Date
Jan 28, 2026
Due Date
Feb 26, 2026
Release: Jan 28, 2026
Close: Feb 26, 2026
Work includes constructing a new 750 LF of 24" dia public waterline, relocating an existing fire hydrant and installing a new water service line including excavation, connection/reconnection to the existing public waterlines, backfilling, compacting, testing, restoring, bypassing and other work.
AvailableThe Town of Bristol, Vermont seeks sealed bids for the Bristol West Waterline Replacement Project, a multi‑street upgrade to replace aging water mains and appurtenances. The project involves approximately 9,600‑9,650 feet of waterline replacement within Bristol, VT, with a pre‑bid/site visit scheduled for January 22, 2026. Bids are due February 12, 2026 at 1:00 PM local time.
Posted Date
-
Due Date
Feb 12, 2026
Close: Feb 12, 2026
The Town of Bristol, Vermont seeks sealed bids for the Bristol West Waterline Replacement Project, a multi‑street upgrade to replace aging water mains and appurtenances. The project involves approximately 9,600‑9,650 feet of waterline replacement within Bristol, VT, with a pre‑bid/site visit scheduled for January 22, 2026. Bids are due February 12, 2026 at 1:00 PM local time.
AvailableProcurement of Professional Surveying and Design Engineering Services for the Alexis Road and Stewart Road Waterline Improvements Project, involving waterline replacement and installation.
Posted Date
Jan 26, 2026
Due Date
Feb 13, 2026
Release: Jan 26, 2026
Close: Feb 13, 2026
Procurement of Professional Surveying and Design Engineering Services for the Alexis Road and Stewart Road Waterline Improvements Project, involving waterline replacement and installation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →