Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Village of Sussex
The proposed construction consists of the repair and/or replacement of storm structures, and pipes; installation of new curb and gutter and sidewalks; base patching; spot repair and/or replacement of curb and gutter, and sidewalks; spot repair and/or replacement of stamped colored concrete patio and concrete pavement; installation of new concrete pavement; the resurfacing and/or replacement of driveways and parking lots; repair and/or replacement of sanitary structures and pipes; installation of pavement markings and symbols; reinstallation of existing signs; around the public safety building, the public works garage, the water pollution control facility. Major work items and approximate quantities for which bids are requested include: full pavement replacement, asphalt overlay only, storm sewer structures repairs, storm sewer pipe spot repairs, sanitary sewer structure repairs, sanitary sewer pipe main repairs, 1,793 SY of concrete pavement, 3,342 of base patching, 938 LF of concrete curb and gutter, 13,222 SY of asphaltic surface milling and resurfacing, and miscellaneous utility repair.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Northmor Local School District
Provide parking lots repair.
Posted Date
Nov 19, 2025
Due Date
Dec 8, 2025
Release: Nov 19, 2025
Northmor Local School District
Close: Dec 8, 2025
Provide parking lots repair.
AvailableCity of Wichita
Streets and parking lots rehabilitation. 6550 lf sawcut; 250 lf fence removed; 655 sy remove and replace 8" concrete pavement; 872 sy remove ex concrete pavement; 515 sy remove ex asphalt pavement; 698 lf remove and replace curb & gutter; 223 lf remove curb & gutter; 9 lf remove flume; 156 lf remove trench drain; 1535 sf remove and replace sidewalk; 743 sf remove sidewalk; 3 lf remove retaining wall; 88 lf remove and replace perforated pipe drain; 3 each adjust mh/valve top; 1 each tree removal; 520 lf sleeves, 4" pvc; 90 lf sleeves, 6" pvc; 3288 sy 6" pcc pavement (fiber reinforced) (macro at 3lbs/sy); 2594 sy 6" crushed rock base; 4058 sy 6" reinforced crushed rock base; 765 sy overexcavation (6" excavation & replacement with 6" crushed rock base). See outside link.
Posted Date
Nov 11, 2025
Due Date
Dec 5, 2025
Release: Nov 11, 2025
City of Wichita
Close: Dec 5, 2025
Streets and parking lots rehabilitation. 6550 lf sawcut; 250 lf fence removed; 655 sy remove and replace 8" concrete pavement; 872 sy remove ex concrete pavement; 515 sy remove ex asphalt pavement; 698 lf remove and replace curb & gutter; 223 lf remove curb & gutter; 9 lf remove flume; 156 lf remove trench drain; 1535 sf remove and replace sidewalk; 743 sf remove sidewalk; 3 lf remove retaining wall; 88 lf remove and replace perforated pipe drain; 3 each adjust mh/valve top; 1 each tree removal; 520 lf sleeves, 4" pvc; 90 lf sleeves, 6" pvc; 3288 sy 6" pcc pavement (fiber reinforced) (macro at 3lbs/sy); 2594 sy 6" crushed rock base; 4058 sy 6" reinforced crushed rock base; 765 sy overexcavation (6" excavation & replacement with 6" crushed rock base). See outside link.
AvailableAugusta Unified School District 402
Construction of parking lots.
Posted Date
Nov 25, 2025
Due Date
Dec 2, 2025
Release: Nov 25, 2025
Augusta Unified School District 402
Close: Dec 2, 2025
Construction of parking lots.
AvailableEastern Greene School District
High school campus parking lot and drives improvements.
Posted Date
Nov 11, 2025
Due Date
Dec 17, 2025
Release: Nov 11, 2025
Eastern Greene School District
Close: Dec 17, 2025
High school campus parking lot and drives improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis