Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Lift station and sewer line replacement. Base Bid: Construction of triplex submersible lift station. Installation of 200 KW generator and pad. Installation of two manholes. Installation of approx. 36 LF of 12" sewer line and 75 LF of 24" sewer line. Abandonment of existing lift station. Associated work. Additive Option 1: Pipe bursting approx. 820 LF of 8" sewer line. Replace existing manholes with 48" Pre-cast concrete manholes. Associated Work. Additive Option 2: Pipe bursting approx. 347 LF of 8" sewer line. Replace existing manholes with 48" Pre-cast concrete manholes. Associated Work. Additive Option 3: Pipe bursting approx. 347 LF of 8" sewer line. Replace existing manholes with 48" Pre-cast concrete manholes. Associated Work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work include the replacement of the highland lift station. Work includes the demolition of the existing lift station and construction of a submersible duplex lift station including a wet well, valve chamber, sanitary sewer, pumps, valve and piping, control panel, electrical, driveway and trail replacement, grass restoration, and all associated appurtenances.
Posted Date
Nov 17, 2025
Due Date
Dec 17, 2025
Release: Nov 17, 2025
Close: Dec 17, 2025
Work include the replacement of the highland lift station. Work includes the demolition of the existing lift station and construction of a submersible duplex lift station including a wet well, valve chamber, sanitary sewer, pumps, valve and piping, control panel, electrical, driveway and trail replacement, grass restoration, and all associated appurtenances.
AvailableThis project's work consists of the replacement of the Lift Station, associated sanitary sewer extensions, and force main replacement.
Posted Date
Nov 12, 2025
Due Date
Dec 17, 2025
Release: Nov 12, 2025
Close: Dec 17, 2025
This project's work consists of the replacement of the Lift Station, associated sanitary sewer extensions, and force main replacement.
AvailableWork includes installation of a new lift station and demolition/abandonment of the existing lift station. Maintaining operations of all systems during construction. Installation of new gravity system and other work.
Posted Date
Nov 7, 2025
Due Date
Jan 7, 2026
Release: Nov 7, 2025
Close: Jan 7, 2026
Work includes installation of a new lift station and demolition/abandonment of the existing lift station. Maintaining operations of all systems during construction. Installation of new gravity system and other work.
AvailableProject involves the replacement of an existing small wastewater lift station. Demolition of existing lift station, including removing existing lift station, removing pavements, removing existing equipment and piping, complete in place; Package Lift Station, includes Pumps, Piping, Fittings, Guide Rails, Lift Chains, Vent, Hatches, Valves, Valve Pit, Electrical Equipment Installation including, but not limited to: lift station control panel, terminal boxes, main breaker, manual transfer switch, conduit, wire, and all ancillary devices; 10 LF Proposed 2" PVC SCHED 40 Sanitary Sewer Force Main;
Posted Date
Dec 11, 2025
Due Date
Jan 15, 2026
Release: Dec 11, 2025
Close: Jan 15, 2026
Project involves the replacement of an existing small wastewater lift station. Demolition of existing lift station, including removing existing lift station, removing pavements, removing existing equipment and piping, complete in place; Package Lift Station, includes Pumps, Piping, Fittings, Guide Rails, Lift Chains, Vent, Hatches, Valves, Valve Pit, Electrical Equipment Installation including, but not limited to: lift station control panel, terminal boxes, main breaker, manual transfer switch, conduit, wire, and all ancillary devices; 10 LF Proposed 2" PVC SCHED 40 Sanitary Sewer Force Main;
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis