Retrieving RFP details
Release
Close
Village of Lake Bluff
All perimeter flashings, sheet metal copings, counter flashing, sanitary stack leads, internal roof drain flashings, perimeter edge metal, etc. are to be removed and discarded. Roof decking to be examined, repaired / coated or replaced as per specification. Installation of EPDM vapor barrier system, new flat stock and tapered polyisocyanurate insulation, new glass faced gypsum recover board to precede the installation of new granule surfaced Modified Membrane roof system and flashings. Installation of new sheet metal accessories, coping caps, counter flashing, perimeter raised metal edge, lead flashings, drain components, etc. to be completed as specified and as required by the Material Manufacturer(s) for a fully warranted roof assembly.
Borough of Throop
Provide low-slope epdm roof replacement. Project includes the following work: removal of approx. 5,395 SF of a combination of polyurethane foam and epdm roofs and installation of new polyisocyanurate insulation and epdm roof, with associated work.
Guilford County Schools
Low Slope Roof Replacement: Areas A, D & I-M: Remove and dispose of the roof system including flashings and sheet metal down to their steel deck. Secure the existing steel deck to structural framing members. Provide Gyspum Substrate loose laid. Provide 2' Roof Insulation mechanically attached. Provide 2" Roof Insulation adhered in foam adhesive. Provide Cover Board adhered in foam adhesive. Fully adhere felt-back thermoplastic single ply membrane along with flashings and accessories. Replace sheet metal flashings and trim.
Massachusetts Convention Center Authority
Low Slope Mechanical Roof.
City of Rochester
The City of Rochester, through its Architectural Services Division, is soliciting proposals for architectural engineering services for the low roof at City Hall. The project includes the design and construction administration to replace the existing roofing installed in 1993 and to install a minimum 20-year-warrantied roof system. Incidental roof drainage and through-wall flashing are to be investigated.
Release
Jan 14, 2025
Close
Feb 25, 2025