Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 2,445 LF 8" class 50 ductile iron gravity sewer main; th); 125 LF 8" class 50 ductile iron gravity sewer main; 230 LF 8" sdr-35 gravity sewer main (jack & bore); 655 LF trenching (0'-6' depth); 10 EA precast manholes (4' diameter) (0'-6' depth); 1 EA drop structure for precast manholes (8" gravity main); 14 EA 4" sewer service connection (long); 1 LS clearing & grubbing; 20 SY remove & replace concrete pavement; 37 SY remove & replace asphalt pavement; CYaggregate base & bedding material (class i).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
RFP for the construction of Wastewater Collection System Improvements, Contract 3 - Lift Station #3 & #4 Rehabilitation.
Posted Date
-
Due Date
Jan 8, 2026
Release: -
Close: Jan 8, 2026
RFP for the construction of Wastewater Collection System Improvements, Contract 3 - Lift Station #3 & #4 Rehabilitation.
AvailableThe project consists of sanitary sewer construction including relevant residential sewage collection systems, pump stations and mainline connections.
Posted Date
Dec 2, 2025
Due Date
Jan 21, 2026
Release: Dec 2, 2025
Close: Jan 21, 2026
The project consists of sanitary sewer construction including relevant residential sewage collection systems, pump stations and mainline connections.
AvailableWastewater Collection System Improvements, Replace Pumping Station ″A″, 2023 Community Development Block Grant.
Posted Date
Jun 27, 2025
Due Date
Dec 12, 2025
Release: Jun 27, 2025
Close: Dec 12, 2025
Wastewater Collection System Improvements, Replace Pumping Station ″A″, 2023 Community Development Block Grant.
Purchase and delivery of a medium to heavy duty wastewater pumper truck with a collection tank for industrial waste management. The wastewater pumper truck will need to include the chassis, vacuum pump, collection tank, hoses, valves, clamps, control panels, gauges, safety equipment, any necessary equipment not listed and an extended warranty.
Posted Date
Dec 3, 2025
Due Date
Dec 17, 2025
Release: Dec 3, 2025
Close: Dec 17, 2025
Purchase and delivery of a medium to heavy duty wastewater pumper truck with a collection tank for industrial waste management. The wastewater pumper truck will need to include the chassis, vacuum pump, collection tank, hoses, valves, clamps, control panels, gauges, safety equipment, any necessary equipment not listed and an extended warranty.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis