Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Furnish track loader, 2 3/4 yd. Or larger: 50 hrs road roller, vibratory, 7 2 TN: 50 hrs rubber tire loader, 2 2 yard or larger: 150 hrs blade tractor, 90 hp: 50 hrs dump truck, 34,000 lbs. Gvw or larger: 150 hrs dump truck, as above, w/snow plow & spreader: 200 hrs dump truck, 73,280 gvw tri-axle: 100 hrs backhoe, 3/8 yd. Or larger, rubber tire: 50 hrs backhoe, 3/4 yd. Or larger, on tracks: 50 hrs snowplow, with jrb coupler, for use on jd tc44h: 200 hrs skid-steer loader with street sweeper attachment: 50 hrs skid-steer loader with 24" milling head attachment: 50 hrs labor- maintenance and other: 400 hrs.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide 1) motorized bituminous paver w/operator and screen operator barber greene 225b or equivalent 36 hrs; 2) 10-ton vibratory roller w/operator min. 66 width drum 36 hrs; 3) 5-ton vibratory roller w/operator case 252 or equivalent 36 hrs; 4) laborers (as needed) for paving work 216 hrs; 5)milling machine w/ operator hrs; 6)tack coat truck w/operator + 47 hrs; 7) water truck w/operator 72 hrs; 8) backhoe w/operator + 0 hrs. ; 9) dump trucks w/operators 388 hrs; 10) sweeper w/operator 47 hrs; 11) track operated 7' milling machine 36 hrs; 12) skid loader w/mill and broom w/operator 144 hrs; 13) midland spd-8 road widener or equivalent 0 hrs; 14) traffic control laborers (as needed) 144 hrs.
Posted Date
Jan 7, 2026
Due Date
Feb 9, 2026
Release: Jan 7, 2026
Close: Feb 9, 2026
Provide 1) motorized bituminous paver w/operator and screen operator barber greene 225b or equivalent 36 hrs; 2) 10-ton vibratory roller w/operator min. 66 width drum 36 hrs; 3) 5-ton vibratory roller w/operator case 252 or equivalent 36 hrs; 4) laborers (as needed) for paving work 216 hrs; 5)milling machine w/ operator hrs; 6)tack coat truck w/operator + 47 hrs; 7) water truck w/operator 72 hrs; 8) backhoe w/operator + 0 hrs. ; 9) dump trucks w/operators 388 hrs; 10) sweeper w/operator 47 hrs; 11) track operated 7' milling machine 36 hrs; 12) skid loader w/mill and broom w/operator 144 hrs; 13) midland spd-8 road widener or equivalent 0 hrs; 14) traffic control laborers (as needed) 144 hrs.
AvailableProcurement of heavy equipment rental and operator services.
Posted Date
Dec 12, 2025
Due Date
Jan 16, 2026
Release: Dec 12, 2025
Close: Jan 16, 2026
Procurement of heavy equipment rental and operator services.
AvailableBread products for the 2026-2027 school year which begins August 2026 and is scheduled to end in May 2027.
Posted Date
Dec 13, 2025
Due Date
Jan 9, 2026
Release: Dec 13, 2025
Close: Jan 9, 2026
Bread products for the 2026-2027 school year which begins August 2026 and is scheduled to end in May 2027.
Milk products for the 2026-2027 school year which begins August 2026, and is scheduled to end in May 2027.
Posted Date
Dec 13, 2025
Due Date
Jan 9, 2026
Release: Dec 13, 2025
Close: Jan 9, 2026
Milk products for the 2026-2027 school year which begins August 2026, and is scheduled to end in May 2027.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis