Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of approx 860 LF of sanitary gravity mains via the pipe bursting method and sanitary service reconnections.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP seeks proposals for the construction of the Town of Utica Proposed Sanitary Sewer System Improvement Project, involving rehabilitation and improvements to the existing sewer collection system.
Posted Date
Dec 17, 2025
Due Date
Jan 26, 2026
Release: Dec 17, 2025
Close: Jan 26, 2026
This RFP seeks proposals for the construction of the Town of Utica Proposed Sanitary Sewer System Improvement Project, involving rehabilitation and improvements to the existing sewer collection system.
AvailableRehabilitation of the sewer collection system.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
Rehabilitation of the sewer collection system.
AvailableThe project consists of sanitary sewer construction including relevant residential sewage collection systems, pump stations and mainline connections.
Posted Date
Dec 2, 2025
Due Date
Jan 21, 2026
Release: Dec 2, 2025
Close: Jan 21, 2026
The project consists of sanitary sewer construction including relevant residential sewage collection systems, pump stations and mainline connections.
AvailableProject consists of furnishing all labor and materials necessary for cleaning, videoing, and lining sanitary sewers using the cured-in-place pipe method and manhole rehabilitation. There is approx 5,900 LF of 8", 10", 24", and 36" sewer lines that need to be lined using the cured-in-place pipe method, and approx 100 VF of manhole that needs level c manhole rehabilitation, and one manhole to be removed and replaced with new precast concrete manhole.
Posted Date
Dec 8, 2025
Due Date
Jan 22, 2026
Release: Dec 8, 2025
Close: Jan 22, 2026
Project consists of furnishing all labor and materials necessary for cleaning, videoing, and lining sanitary sewers using the cured-in-place pipe method and manhole rehabilitation. There is approx 5,900 LF of 8", 10", 24", and 36" sewer lines that need to be lined using the cured-in-place pipe method, and approx 100 VF of manhole that needs level c manhole rehabilitation, and one manhole to be removed and replaced with new precast concrete manhole.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →