Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 560 LF 6" SDR - 9 HDPE water main in 16" HDPE casing by directional boring; 662 LF 6" SDR HDPE water main by directional boring; 1,275 LF 6" SDR-9 HDPE water main by directional boring; 2,932 LF 3/4" SDR -9 HDPE service line in 6" HDPE casing by directional boring; 69,823 SY cold milling of bituminous pavements, all depths; 37 SY concrete sidewalks; 140 LF concrete curb, type I; 33,000 LF 6" wide thermoplastic traffic stripe (skip yellow) (90 miles).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work shall consist of milling and overlay improvements.
Posted Date
Jan 22, 2026
Due Date
Feb 4, 2026
Release: Jan 22, 2026
Close: Feb 4, 2026
Work shall consist of milling and overlay improvements.
AvailablePavement milling, hot mix asphalt overlay, with safety improvement.
Posted Date
Jan 15, 2026
Due Date
Feb 4, 2026
Release: Jan 15, 2026
Close: Feb 4, 2026
Pavement milling, hot mix asphalt overlay, with safety improvement.
AvailableMeade County Water District is soliciting bids for its 2023 Water System Improvements, a construction project in Brandenburg, Kentucky. The work includes constructing a new 16-inch transmission main along KY Joe Prather Highway, upgrades to the Flaherty Pump Station to increase capacity, and construction of a new pump station in Payneville to bolster system reliability. The project aims to improve system redundancy and meet increasing demand across the district.
Posted Date
-
Due Date
Feb 18, 2026
Close: Feb 18, 2026
Meade County Water District is soliciting bids for its 2023 Water System Improvements, a construction project in Brandenburg, Kentucky. The work includes constructing a new 16-inch transmission main along KY Joe Prather Highway, upgrades to the Flaherty Pump Station to increase capacity, and construction of a new pump station in Payneville to bolster system reliability. The project aims to improve system redundancy and meet increasing demand across the district.
Approxi 12 City Blocks of Mill and Overlay, 1,700 tons asphalt surfacing, 15,800 SY asphalt milling, 1,000 LF concrete curb & gutter, 2,900 SF concrete sidewalk.
Posted Date
Jan 22, 2026
Due Date
Feb 3, 2026
Release: Jan 22, 2026
Close: Feb 3, 2026
Approxi 12 City Blocks of Mill and Overlay, 1,700 tons asphalt surfacing, 15,800 SY asphalt milling, 1,000 LF concrete curb & gutter, 2,900 SF concrete sidewalk.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →