Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Millsboro
Design of approx. 14,800 LF of sanitary sewer forcemain and beneficial reuse main (BRM) from Pump Station 7a to a future wastewater treatment plant (WWTP).
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Maryland Port Administration
Provide innovative reuse and beneficial use of dredged material. Recycling of dredged material for use in another product or application, including but not limited to residential, recreational, commercial and industrial uses.
Posted Date
Nov 27, 2019
Due Date
Dec 4, 2025
Release: Nov 27, 2019
Maryland Port Administration
Close: Dec 4, 2025
Provide innovative reuse and beneficial use of dredged material. Recycling of dredged material for use in another product or application, including but not limited to residential, recreational, commercial and industrial uses.
AvailableCity of Warwick
Force main rehabilitation contract.
Posted Date
Oct 6, 2025
Due Date
Nov 20, 2025
Release: Oct 6, 2025
City of Warwick
Close: Nov 20, 2025
Force main rehabilitation contract.
AvailableTown of Falmouth
Constructing, complete with all equipment and accessories, one new wastewater lift station, approx. 15,000 feet of dual HDPE force main, a diversion structure at the discharge of the dual force mains, approx. 6400 LF of 12" DIP water main, pump and ancillary electrical equipment replacement.
Posted Date
Nov 4, 2025
Due Date
Nov 25, 2025
Release: Nov 4, 2025
Town of Falmouth
Close: Nov 25, 2025
Constructing, complete with all equipment and accessories, one new wastewater lift station, approx. 15,000 feet of dual HDPE force main, a diversion structure at the discharge of the dual force mains, approx. 6400 LF of 12" DIP water main, pump and ancillary electrical equipment replacement.
AvailableCity of Hallandale Beach
The work includes construction of approx. 2,800 LF of 30" force main (FM) either by horizontal directional drill (HOD) or open cut or a combination of both. Work includes approx. 1 LS mobilization, 192 LF C900 PVC pipe DR 18-30", 160 LF 12" DI pipe, 1 EA 20" tapping sleeve & gate valve, 1 LS horizontal directional drilling, 465 LF 30" HDPE pipe SDR 11, 150 LF 48" 75 FT long steel conductor casing, 4,000 SY asphalt pavement and patch, 6,000 SY 1.5" milling & resurfacing, 5,000 LF 6" thermoplastic single white striping, 65 SY 4" sidewalk, 5,000 SY sodding/ landscaping, 1 LS tree removal and replacement.
Posted Date
Oct 23, 2025
Due Date
Dec 1, 2025
Release: Oct 23, 2025
City of Hallandale Beach
Close: Dec 1, 2025
The work includes construction of approx. 2,800 LF of 30" force main (FM) either by horizontal directional drill (HOD) or open cut or a combination of both. Work includes approx. 1 LS mobilization, 192 LF C900 PVC pipe DR 18-30", 160 LF 12" DI pipe, 1 EA 20" tapping sleeve & gate valve, 1 LS horizontal directional drilling, 465 LF 30" HDPE pipe SDR 11, 150 LF 48" 75 FT long steel conductor casing, 4,000 SY asphalt pavement and patch, 6,000 SY 1.5" milling & resurfacing, 5,000 LF 6" thermoplastic single white striping, 65 SY 4" sidewalk, 5,000 SY sodding/ landscaping, 1 LS tree removal and replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis