Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Warwick
Force main rehabilitation contract.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Clark County Water Reclamation District (CCWRD)
Installation of dual 16" HDPE force mains totaling 22,600 LF of pipe; installation of new flow meter vault for the new force main; installation of new surge tank, approx. 500 LF of 60β steel casing with dual 16" carrier pipe; installation of new 60β, 72β, and 84β polymer concrete manholes and gravity sewer; rehabilitation of approx. 4,800 LF of 21" gravity sewer by cured-in-place pipe (CIPP); removal of existing diversion structure and replacement with new diversion structure and new bypass screening structure; and removal of approx. 11,300 LF of existing force main.
Posted Date
-
Due Date
Dec 11, 2025
Clark County Water Reclamation District (CCWRD)
Close: Dec 11, 2025
Installation of dual 16" HDPE force mains totaling 22,600 LF of pipe; installation of new flow meter vault for the new force main; installation of new surge tank, approx. 500 LF of 60β steel casing with dual 16" carrier pipe; installation of new 60β, 72β, and 84β polymer concrete manholes and gravity sewer; rehabilitation of approx. 4,800 LF of 21" gravity sewer by cured-in-place pipe (CIPP); removal of existing diversion structure and replacement with new diversion structure and new bypass screening structure; and removal of approx. 11,300 LF of existing force main.
AvailableTown of Carolina Beach
Work includes approx 2,450 LF of 16" FPVC DR18 force main diirectional boring; 16 LF pf 28" 24" DIP class 350; 136 LF pf 54" RCP class III; 1 LS clearing and grubbing; 1,000 LF of silt fencing. See outside link.
Posted Date
Nov 7, 2025
Due Date
Dec 11, 2025
Release: Nov 7, 2025
Town of Carolina Beach
Close: Dec 11, 2025
Work includes approx 2,450 LF of 16" FPVC DR18 force main diirectional boring; 16 LF pf 28" 24" DIP class 350; 136 LF pf 54" RCP class III; 1 LS clearing and grubbing; 1,000 LF of silt fencing. See outside link.
AvailableTownship of South Hanover
Construction of a new pump station with a wet well and control building a new force main from the new pump station to an existing manhole lining of connecting manholes and site work.
Posted Date
Sep 12, 2025
Due Date
Nov 24, 2025
Release: Sep 12, 2025
Township of South Hanover
Close: Nov 24, 2025
Construction of a new pump station with a wet well and control building a new force main from the new pump station to an existing manhole lining of connecting manholes and site work.
AvailableTownship of North Brunswick
Rehabilitation and replacement of the Pump Station Force Main located in Park. The proposed improvements include the cured-in-place lining of approx. 200 LF of existing 14" of ductile iron pipe (D.I.P) force main and the replacement of approximately 765 LF of force main with new 14" of D.I.P Class 52 force main. The project also includes test pits, excavation of sending and receiving pits, backfill, restoration, appurtenances, and all other work in accordance with the Contract Documents.
Posted Date
Sep 17, 2025
Due Date
Nov 21, 2025
Release: Sep 17, 2025
Township of North Brunswick
Close: Nov 21, 2025
Rehabilitation and replacement of the Pump Station Force Main located in Park. The proposed improvements include the cured-in-place lining of approx. 200 LF of existing 14" of ductile iron pipe (D.I.P) force main and the replacement of approximately 765 LF of force main with new 14" of D.I.P Class 52 force main. The project also includes test pits, excavation of sending and receiving pits, backfill, restoration, appurtenances, and all other work in accordance with the Contract Documents.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis