Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Widen ky-181 by four feet on each side from intersection 601 to wendell ford center.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Release: -
Close: Jan 29, 2026
Improve and widen ky 115
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Widen, Resurface, and Bridge. Including 8,396 Cy aggregate base Type A; 39,775 SY subgrade, method B; 32,986 SY separator fabric; 32,186 SY geogrid reinforcement; 13,538 ton superpave, type S3(PG 64-22 OK); 3,300 ton superpave, Type S4(PG 70-28 OK); 6,141 SY cold milling pavement; 107 CY P.C. Concrete for pavement; 1,727 SY of 4" concrete sidewalk; 179 SY of 4" decorative concrete sidewalk; 5 ea manhole (8' dia); 2 ea fire hydrant reset; 1,729 LF of 54" R.C. Pipe class III; 10 LF of 28" X18" R.C. pipe arch class A-III; 29 LF of 15" corrugate polypropylene pipe. See attached file.
Posted Date
Dec 17, 2025
Due Date
Jan 22, 2026
Release: Dec 17, 2025
Close: Jan 22, 2026
Widen, Resurface, and Bridge. Including 8,396 Cy aggregate base Type A; 39,775 SY subgrade, method B; 32,986 SY separator fabric; 32,186 SY geogrid reinforcement; 13,538 ton superpave, type S3(PG 64-22 OK); 3,300 ton superpave, Type S4(PG 70-28 OK); 6,141 SY cold milling pavement; 107 CY P.C. Concrete for pavement; 1,727 SY of 4" concrete sidewalk; 179 SY of 4" decorative concrete sidewalk; 5 ea manhole (8' dia); 2 ea fire hydrant reset; 1,729 LF of 54" R.C. Pipe class III; 10 LF of 28" X18" R.C. pipe arch class A-III; 29 LF of 15" corrugate polypropylene pipe. See attached file.
AvailableThis RFP is for the construction and improvement of Taylor Rd. (KY 3504), including grading, drainage, and asphalt surfacing at the intersection of KY-3504 and Old KY-11.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
This RFP is for the construction and improvement of Taylor Rd. (KY 3504), including grading, drainage, and asphalt surfacing at the intersection of KY-3504 and Old KY-11.
Available113,810 CY unclassified excavation, 15,121 CY aggregate base type A, 67,309 SY cold milling pavement, 721 CY class AA concrete, 728 LF 18" RC pipe class III, 776 LF 18" corr. galv. steel pipe, 50,040 LF sawing pavement. See attached file.
Posted Date
Oct 22, 2025
Due Date
Jan 15, 2026
Release: Oct 22, 2025
Close: Jan 15, 2026
113,810 CY unclassified excavation, 15,121 CY aggregate base type A, 67,309 SY cold milling pavement, 721 CY class AA concrete, 728 LF 18" RC pipe class III, 776 LF 18" corr. galv. steel pipe, 50,040 LF sawing pavement. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →