Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of paving maintenance and ADA sidewalk accessibility improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes pavement preventative maintenance.
Posted Date
Dec 15, 2025
Due Date
Feb 5, 2026
Release: Dec 15, 2025
Close: Feb 5, 2026
Work includes pavement preventative maintenance.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of approx. 92,855 SY of 1.5" cold milling; 74,255 SY of 2.0" cold milling; 21,865 LF of 4" skips white (striping thermoplastic); 17,270 LF of 4" solid yellow (striping thermoplastic); 14,670 LF of 6" solid white (striping thermoplastic); 9,275 TON of 2.0" asphaltic concrete surface (type 5-01); 9,030 TON of 1.5" asphaltic concrete surface (type 5-01); 6,560 LF of 4" skips yellow (striping thermoplastic); 1,205 LF of piano key crosswalk (striping thermoplastic); see outside link for more details.
Posted Date
Dec 19, 2025
Due Date
Jan 30, 2026
Release: Dec 19, 2025
Close: Jan 30, 2026
Project consists of approx. 92,855 SY of 1.5" cold milling; 74,255 SY of 2.0" cold milling; 21,865 LF of 4" skips white (striping thermoplastic); 17,270 LF of 4" solid yellow (striping thermoplastic); 14,670 LF of 6" solid white (striping thermoplastic); 9,275 TON of 2.0" asphaltic concrete surface (type 5-01); 9,030 TON of 1.5" asphaltic concrete surface (type 5-01); 6,560 LF of 4" skips yellow (striping thermoplastic); 1,205 LF of piano key crosswalk (striping thermoplastic); see outside link for more details.
AvailableThe City of West Des Moines, Iowa is soliciting bids for construction of the 1st Street Raccoon River Trail (Project No. 0510-049-2024). Work includes excavation, reinforced concrete pavement, HMA pavement, pipe culverts, erosion control and site restoration per plans and specifications prepared by I&S Group, Inc., with work to begin within ten days of notice to proceed and to be completed by September 30, 2026. Bids are due January 21, 2026 and the solicitation is a Request for Bid (not a grant).
Posted Date
Jan 6, 2026
Due Date
Jan 21, 2026
Release: Jan 6, 2026
Close: Jan 21, 2026
The City of West Des Moines, Iowa is soliciting bids for construction of the 1st Street Raccoon River Trail (Project No. 0510-049-2024). Work includes excavation, reinforced concrete pavement, HMA pavement, pipe culverts, erosion control and site restoration per plans and specifications prepared by I&S Group, Inc., with work to begin within ten days of notice to proceed and to be completed by September 30, 2026. Bids are due January 21, 2026 and the solicitation is a Request for Bid (not a grant).
AvailableThe contractor shall provide all labor, materials, equipment, tools, and appliances necessary to perform FY26 airfield pavement preventative maintenance.
Posted Date
Dec 4, 2025
Due Date
Jan 16, 2026
Release: Dec 4, 2025
Close: Jan 16, 2026
The contractor shall provide all labor, materials, equipment, tools, and appliances necessary to perform FY26 airfield pavement preventative maintenance.