Summary
Work includes 1 LS utility locating and potholing; 148 LF f&i 12" c900 dr18 PVC pipe & appurtenances; 689 LF f&i 12" restrained joint ductile iron pipe & appurtenances; 580 LF f&i 24" cased crossing beneath hwy 99 (jack and bore method); 1 LS f&i boring and receiving pits- excavation, shoring, & backfill; 55 LF f&i 8" c900 dr18 PVC pipe & appurtenances; 90 LF f&i 6" c900 dr18 pvc pipe & appurtenances; 90 LF f&i 6" c900 dr18 PVC pipe & appurtenances; 3 LF f&i 4" c900 dr18 PVC pipe & appurtenances; 2 EA f&i 12" gate valve assembly, valve box, and concrete pad; 1 EA f&i 10" gate valve assembly, valve box, and concrete pad; 2 EA f&i fire hydrant assembly. See attached file.