Retrieving RFP details
Release
Close
Bald Eagle Township
All items to be delivered as requested and may be more or less quantity listed 100 TN 1b aashto no 8 300 TN 2a subbase 100 TN aashto no 57 500 TN 2rc 150 TN r-3 rip rap 150 TN r-4 rip rad 150 TN r-5 rip rap 150 TN r-6 rip rap 150 TN r-7 rip rap 15- TN r-8 rip rap 100 TN railroad ballast #3 500 TN anti-skid.
693C73 Eastern Federal Lands Division
Provide fy26 aashto accreditation and inspection services.
Riverfront Recapture, Inc.
Work consist of installation of erosion controls as necessary to control stormwater runoff, dust, sediment, and debris from exiting the site in accordance with the erosion and sediment control plans. Excavation and regrading of remedial areas. Temporary stockpiling of impacted soils. Excavation of proposed cove area. Filling and regrading of area adjacent to amtrak row. Grading of proposed hill and berm. Establishment of proposed inland wetland enhancement area. Establishment of proposed tidal wetland enhancement area. Restoration of existing inland wetland area. Restoration of existing tidal wetland area. Establishment of pygmyweed benches (grading and transplanting). Transplanting/relocation of select plant and mussel species
California Department of Transportation
Rdwy Exc, CRCP, JPCP, HMA, Temp barrier system, and aggregate subbase.
Release
Oct 28, 2025
Close
Nov 17, 2025