Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
928 CY Erosion control blanket; 283 CY stone riprap, class A4; 1,200 P bituminous materials (prime coat); 223 P bituminous materials (tack coat); 238.400 CY concrete box culverts; 440 CY earth excavation (special) 500 AC seeding, class 2A (special). See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Peoria County is soliciting competitive bids via the Illinois Department of Transportation letting to construct a cast-in-place double-barrel 10.5' x 10' PCC box culvert carrying Akron Road over a branch of Kickapoo Creek. The scope includes HMA paving, erosion control, drainage items, traffic control, and landscaping, with a contract time of 40 working days. Plans and Special Provisions will be posted on the IDOT letting site and electronic bids are accepted via IDOT's eBids portal.
Posted Date
Nov 18, 2025
Due Date
Jan 16, 2026
Release: Nov 18, 2025
Close: Jan 16, 2026
Peoria County is soliciting competitive bids via the Illinois Department of Transportation letting to construct a cast-in-place double-barrel 10.5' x 10' PCC box culvert carrying Akron Road over a branch of Kickapoo Creek. The scope includes HMA paving, erosion control, drainage items, traffic control, and landscaping, with a contract time of 40 working days. Plans and Special Provisions will be posted on the IDOT letting site and electronic bids are accepted via IDOT's eBids portal.
AvailableConstruction of three (3) 16' x 6' reinforced concrete box drainage culverts one (1) 14' x 5' reinforced concrete box drainage culvert one (1) 10' x 4' reinforced concrete box drainage culvert various locations within District 3.
Posted Date
Dec 8, 2025
Due Date
Jan 26, 2026
Release: Dec 8, 2025
Close: Jan 26, 2026
Construction of three (3) 16' x 6' reinforced concrete box drainage culverts one (1) 14' x 5' reinforced concrete box drainage culvert one (1) 10' x 4' reinforced concrete box drainage culvert various locations within District 3.
AvailableBoulder County Public Works solicits bids for the manufacture and delivery of an 18-foot-wide by 10.5-foot-high (inner dimension) precast reinforced concrete double box culvert (two adjacent 18' x 10.5' x 46.5' units) including four precast skewed end sections to be delivered near 6847 Baseline Road in unincorporated Boulder County. Delivery must occur during a controlled road closure with truck access; bidders must be qualified concrete product producers and complete required submittal forms and schedule/insurance documentation. The ITB was posted 2025-12-15 and closes 2026-01-15; questions are due 2025-12-30.
Posted Date
Dec 15, 2025
Due Date
Jan 15, 2026
Release: Dec 15, 2025
Close: Jan 15, 2026
Boulder County Public Works solicits bids for the manufacture and delivery of an 18-foot-wide by 10.5-foot-high (inner dimension) precast reinforced concrete double box culvert (two adjacent 18' x 10.5' x 46.5' units) including four precast skewed end sections to be delivered near 6847 Baseline Road in unincorporated Boulder County. Delivery must occur during a controlled road closure with truck access; bidders must be qualified concrete product producers and complete required submittal forms and schedule/insurance documentation. The ITB was posted 2025-12-15 and closes 2026-01-15; questions are due 2025-12-30.
AvailableIDOT is soliciting bids to replace the Warren County CH 7 bridge over Cedar Creek, approximately 3.4 miles northeast of Monmouth. The work includes demolition of the existing structure and construction of a new bridge with structural steel, piles, epoxy-coated reinforcement, deck improvements, riprap/rainfall/erosion control, guardrail, and related roadway work, specified for 50 working days. Bids are due at the January 16, 2026 letting at 12:00 PM CT via IDOT’s e-bidding portal; plans/specifications will be posted by IDOT when available.
Posted Date
Nov 25, 2025
Due Date
Jan 16, 2026
Release: Nov 25, 2025
Close: Jan 16, 2026
IDOT is soliciting bids to replace the Warren County CH 7 bridge over Cedar Creek, approximately 3.4 miles northeast of Monmouth. The work includes demolition of the existing structure and construction of a new bridge with structural steel, piles, epoxy-coated reinforcement, deck improvements, riprap/rainfall/erosion control, guardrail, and related roadway work, specified for 50 working days. Bids are due at the January 16, 2026 letting at 12:00 PM CT via IDOT’s e-bidding portal; plans/specifications will be posted by IDOT when available.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis