Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Glendale is soliciting quotes for the purchase of one (1) new 15 MVA base power transformer to be delivered to Glendale, California, per attached specifications. The RFQ specifies insurance requirements (general liability, auto liability, workers’ compensation), submission procedures (PlanetBids portal required; no email or fax), and reserves the right to accept or reject quotations in whole or in part. The solicitation was posted Dec 15, 2025 and has a response deadline of Feb 16, 2026, and is categorized as an RFQ (Request for Quote), not a grant.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Facilities to be constructed include a new power plant (B451) to house the backup generators and spaces for operational support; the backup generators; fuel storage and fuel offload facilities; commercial power; new transformers; medium voltage switches, manholes, and Underground Primary Distribution power lines; load bank connection and switching equipment; replicated powerplant controls in Building 433; and all necessary support.
Posted Date
Sep 3, 2025
Due Date
Feb 6, 2026
Release: Sep 3, 2025
Close: Feb 6, 2026
Facilities to be constructed include a new power plant (B451) to house the backup generators and spaces for operational support; the backup generators; fuel storage and fuel offload facilities; commercial power; new transformers; medium voltage switches, manholes, and Underground Primary Distribution power lines; load bank connection and switching equipment; replicated powerplant controls in Building 433; and all necessary support.
AvailableSeeking industry feedback for the nuclear power training facility simulation expansion. The purpose of the industry day is to generate interest and explain a highly complex project (cui, seismic, multiple buildings, multiple phases, multiple site improvements and repairs, early delivery on one of the buildings, etc. ). Project will construct the following facilities and infrastructure improvements: two-story training support building (tsb). Multi-story high bay (hb) simulator building. Mechanical building (mb). Improvements to electrical, water, sanitary, storm water, and telecom utility distribution infrastructure to support the new facilities. See outside link.
Posted Date
Oct 1, 2025
Due Date
Jan 31, 2026
Release: Oct 1, 2025
Close: Jan 31, 2026
Seeking industry feedback for the nuclear power training facility simulation expansion. The purpose of the industry day is to generate interest and explain a highly complex project (cui, seismic, multiple buildings, multiple phases, multiple site improvements and repairs, early delivery on one of the buildings, etc. ). Project will construct the following facilities and infrastructure improvements: two-story training support building (tsb). Multi-story high bay (hb) simulator building. Mechanical building (mb). Improvements to electrical, water, sanitary, storm water, and telecom utility distribution infrastructure to support the new facilities. See outside link.
90 ea, power supply, NSN: 6130015777393; 65 ea, power supply, NSN: 6130015784483; 28 ea, power supply, NSN: 6130016189824. with one base year and four (4) possible option years is anticipated.
Posted Date
Dec 11, 2025
Due Date
Jan 24, 2026
Release: Dec 11, 2025
Close: Jan 24, 2026
90 ea, power supply, NSN: 6130015777393; 65 ea, power supply, NSN: 6130015784483; 28 ea, power supply, NSN: 6130016189824. with one base year and four (4) possible option years is anticipated.
AvailableA contract for base alarm services. Base Alarm requirement will provide a service to perform maintenance and repair on the current bases alarm system and CCTV system. This will include cleaning, scheduling, repairing, planing and or replacement of base alarm, access control readers, workstations and various types of surveillance equipment to insure Air Force requirements are met. Additionally, contractor shall maintain the the VPN which currently is part of the base network backbone, this requires network troubleshooting experience, testing and evaluating the current condition or state of the VPN, the ability to utilizing network test equipment for measuring voltages and frequencies on the network. The service will also require a good degree of network experience on IP configurations for surveillance equipment and alarm system components. This includes Fiber, Network switches (CISCO), Network video reorders, media converts, and LPR technology.
Posted Date
Dec 5, 2025
Due Date
Jan 26, 2026
Release: Dec 5, 2025
Close:
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →A contract for base alarm services. Base Alarm requirement will provide a service to perform maintenance and repair on the current bases alarm system and CCTV system. This will include cleaning, scheduling, repairing, planing and or replacement of base alarm, access control readers, workstations and various types of surveillance equipment to insure Air Force requirements are met. Additionally, contractor shall maintain the the VPN which currently is part of the base network backbone, this requires network troubleshooting experience, testing and evaluating the current condition or state of the VPN, the ability to utilizing network test equipment for measuring voltages and frequencies on the network. The service will also require a good degree of network experience on IP configurations for surveillance equipment and alarm system components. This includes Fiber, Network switches (CISCO), Network video reorders, media converts, and LPR technology.
Available