Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 310 SY of remov conc (driveways); 4,675 SY of rmv (2"-6") trt/untrt base & asph pav; 222 CY of excav (roadway); 53,738 SY of compost manuf topsoil (4"); 535 SY of block sodding; 53,203 SY of drill seed (perm_rural_clay); 46,420 SY of cement trt (exist matl & new base)(6"); 10,665 GAL of asph (crs-2p); 8,957 GAL of asph (ac-15p, ac-20-5tr or ac-20xp); 30,113 SY of plane asph conc pav(5"); etc, see outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The work consist of approx 265 SY pavement removed; 6,335 SY linear grading; 28,928 SF 4" concrete walk; 6,335 SY seeding and mulching; 500 FT 6" base pipe underdrains with geotextile fabric; 34 EA manhole adjusted to grade; 9,600 FT full depth sawing; 304 FT 3" conduit jacked or drilled.
Posted Date
Dec 15, 2025
Due Date
Jan 21, 2026
Release: Dec 15, 2025
Close: Jan 21, 2026
The work consist of approx 265 SY pavement removed; 6,335 SY linear grading; 28,928 SF 4" concrete walk; 6,335 SY seeding and mulching; 500 FT 6" base pipe underdrains with geotextile fabric; 34 EA manhole adjusted to grade; 9,600 FT full depth sawing; 304 FT 3" conduit jacked or drilled.
AvailableThe work consist of approx 4,629 LF clean culvert pipe; 20,078 SY removal of concrete pavement; 195,923 LF grinding for pavement markings; 125,114 CY roadway excavation; 26,216 SY seeding. MJN
Posted Date
Oct 15, 2025
Due Date
Jan 15, 2026
Release: Oct 15, 2025
Close: Jan 15, 2026
The work consist of approx 4,629 LF clean culvert pipe; 20,078 SY removal of concrete pavement; 195,923 LF grinding for pavement markings; 125,114 CY roadway excavation; 26,216 SY seeding. MJN
AvailableRehabilitate runway 7-25 lighting.
Posted Date
Dec 20, 2025
Due Date
Jan 15, 2026
Release: Dec 20, 2025
Close: Jan 15, 2026
Rehabilitate runway 7-25 lighting.
AvailableRehabilitate drainage structures.
Posted Date
-
Due Date
Jan 27, 2026
Close: Jan 27, 2026
Rehabilitate drainage structures.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis