Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Chicago Department of Aviation is soliciting bids for the rehabilitation of Taxiways S, S1, S2, and S3 at O’Hare Airport, including pavement rehabilitation, concrete repairs, drainage improvements and related airport construction work. The solicitation is advertised as Specification 1327954 / Solicitation 57091 and includes a mandatory pre-bid conference at O’Hare’s Central Field Office; DBE goal shown as 0%. Bids open on 2026-02-26 and the City is accepting electronic bids via its eProcurement system.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of the taxiways S, S1, S2, and S3 rehabilitation project includes, but is not limited to, the following items: installation of erosion control devices and security measures; demolition of pavements, utilities and miscellaneous items; earthwork and grading; installation of underdrains, storm sewers and drainage structures; paving, resurfacing, portland concrete cement (PCC) panel replacement, widening; reconstruction of taxiways, shoulders, vehicle service roads, and apron taxilanes; conversion of emergency access roadway; installation of airfield lighting, signage bases and fixtures, signing, and electrical systems; pavement marking; topsoiling, seeding, sodding, mulching, and erosion control.
Posted Date
Jan 13, 2026
Due Date
Feb 26, 2026
Release: Jan 13, 2026
Close: Feb 26, 2026
Construction of the taxiways S, S1, S2, and S3 rehabilitation project includes, but is not limited to, the following items: installation of erosion control devices and security measures; demolition of pavements, utilities and miscellaneous items; earthwork and grading; installation of underdrains, storm sewers and drainage structures; paving, resurfacing, portland concrete cement (PCC) panel replacement, widening; reconstruction of taxiways, shoulders, vehicle service roads, and apron taxilanes; conversion of emergency access roadway; installation of airfield lighting, signage bases and fixtures, signing, and electrical systems; pavement marking; topsoiling, seeding, sodding, mulching, and erosion control.
AvailableThe Project provides for the rehabilitation of taxiways, including milling, paving, drainage, pavement markings, landscaping, lighting system, airfield guidance signs and sign bases, maintenance and protection of traffic, and related work.
Posted Date
Nov 7, 2025
Due Date
Jan 30, 2026
Release: Nov 7, 2025
Close: Jan 30, 2026
The Project provides for the rehabilitation of taxiways, including milling, paving, drainage, pavement markings, landscaping, lighting system, airfield guidance signs and sign bases, maintenance and protection of traffic, and related work.
AvailableThe Project provides for the rehabilitation of taxiways, including milling, paving, drainage, pavement markings, landscaping, lighting system, airfield guidance signs and sign bases, concrete slabs and related work.
Posted Date
Nov 7, 2025
Due Date
Jan 30, 2026
Release: Nov 7, 2025
Close: Jan 30, 2026
The Project provides for the rehabilitation of taxiways, including milling, paving, drainage, pavement markings, landscaping, lighting system, airfield guidance signs and sign bases, concrete slabs and related work.
AvailableWork includes rehabilitation of taxiways, including pavement rutting repairs, milling and overlay, associated electrical, pavement markings and related work at sections of taxiway p, cc and bb west of runway 4-22.
Posted Date
-
Due Date
Feb 3, 2026
Release: -
Close: Feb 3, 2026
Work includes rehabilitation of taxiways, including pavement rutting repairs, milling and overlay, associated electrical, pavement markings and related work at sections of taxiway p, cc and bb west of runway 4-22.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis