Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This active government solicitation, titled "131st Ave Infrastructure Improvements," is issued by the City of Lake Stevens. It involves roadway and sewer infrastructure work, including sanitary sewer main replacement/installation, stormwater management, and the creation of a multi-use path. The project aims to enhance traffic flow and environmental controls along 131st Avenue.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Fresno seeks construction services to install a HAWK pedestrian signal at First St & Home Ave and a traffic signal at Chestnut Ave & Weldon Ave, including conduits, pull boxes, conductors, loop detectors, signal poles, controller cabinet, ITS equipment, service pedestal, curb ramps, valley gutter, pavement rehabilitation, signing and striping. The estimated construction allocation is $1,599,650.00 and the work must be completed within 90 working days from the Notice to Proceed. Bidders must hold a valid California Class 'A' or 'C-10' contractor license, provide required bonds (10% bid bond, 100% payment and performance bonds) and comply with federal requirements for federally assisted construction projects.
Posted Date
Dec 15, 2025
Due Date
Jan 20, 2026
Premium
Access the largest public sector contact database
Close: Jan 20, 2026
The City of Fresno seeks construction services to install a HAWK pedestrian signal at First St & Home Ave and a traffic signal at Chestnut Ave & Weldon Ave, including conduits, pull boxes, conductors, loop detectors, signal poles, controller cabinet, ITS equipment, service pedestal, curb ramps, valley gutter, pavement rehabilitation, signing and striping. The estimated construction allocation is $1,599,650.00 and the work must be completed within 90 working days from the Notice to Proceed. Bidders must hold a valid California Class 'A' or 'C-10' contractor license, provide required bonds (10% bid bond, 100% payment and performance bonds) and comply with federal requirements for federally assisted construction projects.
AvailableThis project consists of the construction of public infrastructure improvements. Improvements consist of the addition of a new paved roadway extension of Drive approx. 1,700 FT west of SR 79, stormwater ponds, filling of existing ponds, the addition of turn lanes on SR 79, the addition of a signalized intersection, new sewer lift station, a 8" water main extension, and an 8" gravity sewer extension along the new roadway. This project also includes clearing and grubbing, earth moving, roadway base work, concrete curb and gutters, concrete pavement, roundabout construction, signing and pavement markings.
Posted Date
Oct 15, 2025
Due Date
Dec 18, 2025
Release: Oct 15, 2025
Close: Dec 18, 2025
This project consists of the construction of public infrastructure improvements. Improvements consist of the addition of a new paved roadway extension of Drive approx. 1,700 FT west of SR 79, stormwater ponds, filling of existing ponds, the addition of turn lanes on SR 79, the addition of a signalized intersection, new sewer lift station, a 8" water main extension, and an 8" gravity sewer extension along the new roadway. This project also includes clearing and grubbing, earth moving, roadway base work, concrete curb and gutters, concrete pavement, roundabout construction, signing and pavement markings.
AvailableSeek a highly qualified contractor for the construction of drive se infrastructure improvements.
Posted Date
Dec 15, 2025
Due Date
Jan 21, 2026
Release: Dec 15, 2025
Close: Jan 21, 2026
Seek a highly qualified contractor for the construction of drive se infrastructure improvements.
AvailableHolmes County solicits engineering services for infrastructure improvements at Holmes County Industrial Park (EDA project), including preparation of a Preliminary Engineering Report (PER); plans and specifications for bidding; bid evaluation and contract award recommendation; EDA-compliant contract preparation; pre-construction coordination; construction inspection; and contractor payment oversight and EDA compliance.
Posted Date
Dec 4, 2025
Due Date
Dec 18, 2025
Release: Dec 4, 2025
Close: Dec 18, 2025
Holmes County solicits engineering services for infrastructure improvements at Holmes County Industrial Park (EDA project), including preparation of a Preliminary Engineering Report (PER); plans and specifications for bidding; bid evaluation and contract award recommendation; EDA-compliant contract preparation; pre-construction coordination; construction inspection; and contractor payment oversight and EDA compliance.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis