Directional boring and open cut construction of new 8" and 12" water main and corresponding appurtenances.
Village of Long Grove
Installation of approx., 1,500 LF of 12" ductile iron water main constructed by both open-cut and trenchless methods. The work also includes the installation of a steel casing pipe beneath aptakisic road by jacking and boring methods. Major work items include, but are not limited to, the installation of approximately 1,500 LF of 12" ductile iron water main, steel casing pipe, fire hydrants, valve vaults, trench backfill, pavement patching, and site restoration.
Council Bluffs Water Works
Scope of work consisting of approx 5,016 LF of 16" DI water main and 1,692 LF of 12" DI water main and all appurtenances
Washington Suburban Sanitary Commission (WSSC)
Contract consists of the replacement of approx 85 FT of 6" water house connection, 440 FT of fire hydrant leads, 410 FT of 8" water house connection, 450" of 8" water main, 45 FT of 10" water house connection, 185 FT of 10" water main, 240 FT of 12" water main, 9,160 FT of 24" water main and 335 FT of water house connections.
Howard County
The installation of approx 3,900 LF of 6", 8", 12", and 14" water distribution main loop . including crossing Interstate Highway I-95 inside an existing pipe/casing, a new pressure zone division valve, new fire hydrants, traffic control, surface restoration, soil erosion and sediment control plan