Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of St. Clair Shores
Directional boring and open cut construction of new 8" and 12" water main and corresponding appurtenances.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of LaBelle
Work includes construction of approximately 13,600 linear feet of 12" pvc (dr-18) water main by open cut, 400 linear feet of 12" pvc (dr-14) water main by open cut, and two (2) linear feet of 10" pvc (dr-18) water main by open cut with associated fittings, twenty-eight (28) fire hydrants, twenty-eight (28) 12" vertical gate valves, and two (2) 10" vertical gate valves. Connections to the existing water main will be made at two (2) points by using fittings such as tapping sleeve and valve. Eight (8) connections for future development are proposed to be included.
Posted Date
Oct 29, 2025
Due Date
Dec 16, 2025
Release: Oct 29, 2025
City of LaBelle
Close: Dec 16, 2025
Work includes construction of approximately 13,600 linear feet of 12" pvc (dr-18) water main by open cut, 400 linear feet of 12" pvc (dr-14) water main by open cut, and two (2) linear feet of 10" pvc (dr-18) water main by open cut with associated fittings, twenty-eight (28) fire hydrants, twenty-eight (28) 12" vertical gate valves, and two (2) 10" vertical gate valves. Connections to the existing water main will be made at two (2) points by using fittings such as tapping sleeve and valve. Eight (8) connections for future development are proposed to be included.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Barrow County
Work includes covered bridge road water main extension project.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
Barrow County
Close: Dec 18, 2025
Work includes covered bridge road water main extension project.
AvailableCity of Celina
The City of Celina seeks bids for the Elm Ridge - Pipeline, Ground Storage Tank, and Harper Road Pump Station Improvements, including installation of approximately 3,740 LF of 12-inch pipeline, construction of a 1.0 million-gallon prestressed concrete ground storage tank, and replacement of pumps at the Harper Road Pump Station. This opportunity is posted as an Invitation for Bid on the Celina eBid portal with a close date of December 11, 2025.
Posted Date
Oct 24, 2025
Due Date
Dec 11, 2025
Release: Oct 24, 2025
City of Celina
Close: Dec 11, 2025
The City of Celina seeks bids for the Elm Ridge - Pipeline, Ground Storage Tank, and Harper Road Pump Station Improvements, including installation of approximately 3,740 LF of 12-inch pipeline, construction of a 1.0 million-gallon prestressed concrete ground storage tank, and replacement of pumps at the Harper Road Pump Station. This opportunity is posted as an Invitation for Bid on the Celina eBid portal with a close date of December 11, 2025.
AvailableMadison County
Install the new pipe and appurtenances, install new service lines, pressure test and disinfect all new piping, transfer service to the new main, abandon in-place the existing mains, perform all driveway and road repairs, perform final landscaping and restore the entire site to preconstruction condition. Provide necessary stormwater permit, install, and maintain temporary erosion control devices;install approximately 21,010 linear feet of new 6-inch ductile iron and pvc water main by open cut or directional bore, including hydrants, valves, and air relief valve assemblies, as shown on the construction drawings; install approximately 160 lf of hdpe main by directional bore, as shown on the construction drawings. See outside link.
Posted Date
Nov 5, 2025
Due Date
Dec 4, 2025
Release: Nov 5, 2025
Madison County
Close: Dec 4, 2025
Install the new pipe and appurtenances, install new service lines, pressure test and disinfect all new piping, transfer service to the new main, abandon in-place the existing mains, perform all driveway and road repairs, perform final landscaping and restore the entire site to preconstruction condition. Provide necessary stormwater permit, install, and maintain temporary erosion control devices;install approximately 21,010 linear feet of new 6-inch ductile iron and pvc water main by open cut or directional bore, including hydrants, valves, and air relief valve assemblies, as shown on the construction drawings; install approximately 160 lf of hdpe main by directional bore, as shown on the construction drawings. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →