Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 6 EA furnish, install and move to active project area - project information sign; 1 LS traffic control, including but not limited to signage, control devices, temporary drainage, paving; 1 LS swppp, complete in place including reports; 7,389 LF trench safety system; 1 LS tree and plant protection; 1 AC clearing and grubbing; 5,359 SY roadway pavement removal and replacement, all pavement materials, thicknesses, gutters, curbs, sidewalk curb, subgrade; 84 SY sidewalk pavement removal and replacement; 70 SF removal and replacement concrete wheelchair ramp including headers, dowels expansion joints, staining and truncated dome pavers. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of Huntsville is seeking bids for the construction of the 11th Street and Hickory Drive Waterline Rehabilitation project, which includes the installation of approximately 3,500 LF of 12" PVC waterline and 7,400 LF of 8" PVC waterline, along with reconnection and relocation of existing water services and fire hydrants.
Posted Date
Nov 15, 2025
Due Date
Dec 17, 2025
Release: Nov 15, 2025
Close: Dec 17, 2025
The City of Huntsville is seeking bids for the construction of the 11th Street and Hickory Drive Waterline Rehabilitation project, which includes the installation of approximately 3,500 LF of 12" PVC waterline and 7,400 LF of 8" PVC waterline, along with reconnection and relocation of existing water services and fire hydrants.
AvailableThe project consist of approx 7,389 LF complete in place trench safety system; 5,359 SY Roadway Pavement Removal and Replacement, all pavement materials, thicknesses, gutters, curbs, sidewalk curb, subgrade, and etc. Replace to match existing, and in accordance with construction specifications and details, complete in place; 84 SY Sidewalk Pavement Removal and Replacement, complete in place; 2,433 LF 12" waterline via open cut; 581 LF 8" waterline in steel casing by trenchless construction.
Posted Date
Nov 13, 2025
Due Date
Dec 17, 2025
Release: Nov 13, 2025
Close: Dec 17, 2025
The project consist of approx 7,389 LF complete in place trench safety system; 5,359 SY Roadway Pavement Removal and Replacement, all pavement materials, thicknesses, gutters, curbs, sidewalk curb, subgrade, and etc. Replace to match existing, and in accordance with construction specifications and details, complete in place; 84 SY Sidewalk Pavement Removal and Replacement, complete in place; 2,433 LF 12" waterline via open cut; 581 LF 8" waterline in steel casing by trenchless construction.
Release: Nov 19, 2025
Close: Jan 7, 2026
Street rehabilitation project.
AvailableWork consists of the replacement of approx 1,130 LF of 6" cast iron waterline with 8-inch ductile iron pipe from Weber Avenue NE west along 9th Street NE then through an off-road easement to Woodside Avenue NE. Approx 815 LF of 9th Street NE will then be reconstructed from Weber west to the cul-de-sac including new 304 aggregate, full depth asphalt pavement, concrete driveway aprons, and concrete curb and gutter.
Posted Date
Dec 4, 2025
Due Date
Dec 19, 2025
Release: Dec 4, 2025
Close: Dec 19, 2025
Work consists of the replacement of approx 1,130 LF of 6" cast iron waterline with 8-inch ductile iron pipe from Weber Avenue NE west along 9th Street NE then through an off-road easement to Woodside Avenue NE. Approx 815 LF of 9th Street NE will then be reconstructed from Weber west to the cul-de-sac including new 304 aggregate, full depth asphalt pavement, concrete driveway aprons, and concrete curb and gutter.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis