Retrieving RFP details
Release
Close
Illinois Department of Transportation
Work includes 3 ea. 30" x 6" PVC sewer service connections; 4 EA. 15" x 6" PVC sewer service connections; 40' PVC combined sewer pipe replacement 15"; 140' PVC combined sewer pipe replacement 12"; 15 EA. 12" x 6" PVC sewer service connections; 120' sanitary sewer service 6"; 2 EA. Maintenance of existing flashing beacon installation; 24,000 SY hot-mix asphalt surface removal, variable depth; 9,600' thermoplastic pavement marking - line 4"; 375' thermoplastic pavement marking - line 24"; 275' combination concrete curb and gutter, type B-6.12.
Illinois Department of Transportation
Work includes 13 EA. Water service install, 1" complete; 1 EA. Water service install, 2" complete; 1 EA. Pressure connection; 45' storm sewer (water main requirements) 8"; 145' storm sewer (water main requirements) 10"; 325' storm sewer (water main requirements) 12"; 60' storm sewer (water main requirements) 15"; 105' storm sewer (water main requirements) 18"; 1 EA. Manholes, type a, 10'-dia, type 1 frame, closed lid; 4 EA. Plug water main 4"; 10 EA. Plug water main 8"; 200 LF cured-in-place pipe liner, 18".
City of Fairfield
Project includes milling and approx., 1,000 tons of HMA overlay.
Illinois Department of Transportation
Work includes 1,034 SY topsoil furnish and place, 4"; 11,236' longitudinal joint sealant; 728 SY hot-mix asphalt surface removal - butt joint; 53,633 SY hot-mix asphalt surface removal, 3 3/4"; 3 sywelded wire reinforcement; 1,073 SY class D patches, type II, 12"; 135 SY class d patches, type I, 12"; 671 SY class D patches, type IV, 12"; 10,209 sf concrete median surface, 4"; 14,453' shoulder rumble strips, 16"; 22,434' temporary pavement marking - line 4"- paint; 329' temporary pavement marking - line 24"- paint.
Release
-
Close
Nov 07, 2025