Retrieving RFP details
Release
Close
City of Fairfield
Project includes milling and approx., 1,000 tons of HMA overlay.
Irwin County
Work includes resurfacing improvements to road.
City of Lake Alfred
Provide street resurfacing services. All potholes shall be patched before resurfacing. Intersections when needed will be milled for a smooth transition. Roadways without curbing will be edged and swept before resurfacing. Roadways with curbing will be cleaned and free of vegetation before resurfacing. Resurfacing will be done with a minimum of two inches of type sp 9.5 or better asphalt. Roads to be milled will be done at a minimum of one inch. New surfacing will be done to ensure a smooth transition around manholes in the paved area. Preform manhole ring and cover adjustments. All traffic control and detouring will be the responsibility of the contractor.
City of Brighton
Street patching - project consists of replacing failing concrete.
Release
Oct 14, 2025
Close
Nov 06, 2025