Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 13 EA. Water service install, 1" complete; 1 EA. Water service install, 2" complete; 1 EA. Pressure connection; 45' storm sewer (water main requirements) 8"; 145' storm sewer (water main requirements) 10"; 325' storm sewer (water main requirements) 12"; 60' storm sewer (water main requirements) 15"; 105' storm sewer (water main requirements) 18"; 1 EA. Manholes, type a, 10'-dia, type 1 frame, closed lid; 4 EA. Plug water main 4"; 10 EA. Plug water main 8"; 200 LF cured-in-place pipe liner, 18".
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
IDOT is soliciting bids to resurface Jackson Boulevard between Des Plaines Avenue and Harlem Avenue in the Village of Forest Park, Cook County. The project includes hot-mix asphalt resurfacing and associated items such as curb and gutter, sidewalk/ADA improvements, pavement markings, and utility-related work as indicated by the pay items. The contract is scheduled for the January 16, 2026 letting and includes 70 working days.
Posted Date
Nov 17, 2025
Due Date
Jan 16, 2026
Release: Nov 17, 2025
Close: Jan 16, 2026
IDOT is soliciting bids to resurface Jackson Boulevard between Des Plaines Avenue and Harlem Avenue in the Village of Forest Park, Cook County. The project includes hot-mix asphalt resurfacing and associated items such as curb and gutter, sidewalk/ADA improvements, pavement markings, and utility-related work as indicated by the pay items. The contract is scheduled for the January 16, 2026 letting and includes 70 working days.
AvailableIllinois Department of Transportation (IDOT) is letting Contract 019-61M09 for HMA resurfacing on 34th Street from Harlem Avenue to Ogden Avenue in the City of Berwyn, Cook County. The work includes patching, PCC base course widening, sidewalk, curb and gutter, drainage improvements, and traffic signal modernization. Bids are due at the January 16, 2026 letting at 12:00 PM (CT).
Posted Date
Nov 17, 2025
Due Date
Jan 16, 2026
Release: Nov 17, 2025
Close: Jan 16, 2026
Illinois Department of Transportation (IDOT) is letting Contract 019-61M09 for HMA resurfacing on 34th Street from Harlem Avenue to Ogden Avenue in the City of Berwyn, Cook County. The work includes patching, PCC base course widening, sidewalk, curb and gutter, drainage improvements, and traffic signal modernization. Bids are due at the January 16, 2026 letting at 12:00 PM (CT).
Illinois Department of Transportation (IDOT) is letting Contract 019-61M09 for HMA resurfacing on 34th Street from Harlem Avenue to Ogden Avenue in the City of Berwyn, Cook County. The work includes patching, PCC base course widening, sidewalk, curb and gutter, drainage improvements, and traffic signal modernization. Bids are due at the January 16, 2026 letting at 12:00 PM (CT).
Posted Date
Nov 17, 2025
Due Date
Jan 16, 2026
Release: Nov 17, 2025
Close: Jan 16, 2026
Illinois Department of Transportation (IDOT) is letting Contract 019-61M09 for HMA resurfacing on 34th Street from Harlem Avenue to Ogden Avenue in the City of Berwyn, Cook County. The work includes patching, PCC base course widening, sidewalk, curb and gutter, drainage improvements, and traffic signal modernization. Bids are due at the January 16, 2026 letting at 12:00 PM (CT).
Procurement of construction services for the Vera Avenue Bike Boulevard Project, encompassing demolition, excavation, paving, concrete work, storm drain installation, landscaping, and traffic control.
Posted Date
Dec 16, 2025
Due Date
Jan 7, 2026
Release: Dec 16, 2025
Close: Jan 7, 2026
Procurement of construction services for the Vera Avenue Bike Boulevard Project, encompassing demolition, excavation, paving, concrete work, storm drain installation, landscaping, and traffic control.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis