Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Roof replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Release: Jan 28, 2026
Close: Mar 24, 2026
Roof replacement.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide roof replacement. Remove existing roof system down to the structural deck, including roof membrane(s), and underlying insulation, underlayments, and additional roof membranes. Inspect the existing structural deck, and inform the Owner immediately of observed damage and or deterioration.
Posted Date
Jan 23, 2026
Due Date
Feb 23, 2026
Release: Jan 23, 2026
Close: Feb 23, 2026
Provide roof replacement. Remove existing roof system down to the structural deck, including roof membrane(s), and underlying insulation, underlayments, and additional roof membranes. Inspect the existing structural deck, and inform the Owner immediately of observed damage and or deterioration.
AvailableThe project will include approx. the replacement of the existing single ply roof system with a fully adhered EPDM and PVC roof system. Work will also include removal of the existing EIFS wall system and installation of new composite metal wall panels.
Posted Date
Jan 23, 2026
Due Date
Feb 17, 2026
Release: Jan 23, 2026
Close: Feb 17, 2026
The project will include approx. the replacement of the existing single ply roof system with a fully adhered EPDM and PVC roof system. Work will also include removal of the existing EIFS wall system and installation of new composite metal wall panels.
AvailableWork includes approx. to replace the existing ballasted EPDM roof with a new built-up roof system. The project will also include new through wall flashing at masonry wall transitions, new skylights, and minor modifications to roof top equipment.
Posted Date
Jan 16, 2026
Due Date
Feb 12, 2026
Release: Jan 16, 2026
Close: Feb 12, 2026
Work includes approx. to replace the existing ballasted EPDM roof with a new built-up roof system. The project will also include new through wall flashing at masonry wall transitions, new skylights, and minor modifications to roof top equipment.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →