Summary
Work consists of milling and placing a hot applied chip seal coat, followed by applying micro-surfacing. The project also includes spot repair work by milling and replacing with asphaltic concrete. Additional work includes replacing pavement markings and other miscellaneous work. Includes 106,099 SY of remove bituminous pavement (micro-milling); 28,864 SY of remove bituminous pavement (milling) (2 1/2"): 263 TON of emulsified asphalt (micro-surfacing); 134,963 SY of cover material; 2,024 TON of dry mineral aggregate (micro-surfacing) (type iii); 3,204 TON of asphaltic concrete (miscellaneous structural) (special mix); 106,128 LF of pavement marking (white extruded thermoplastic)(0.120"); 98,050 LF of pavement marking (yellow extruded thermoplastic)(0.120"); see attached files.