Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construct four lane divided highway from a four lane undivided highway.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement for the construction and installation of a new traffic signal system, including signal poles, signal heads, controller, video detection, conduit, cabling, luminaires, and pavement markings at the intersection of US Highway 31 and Shelby County Highway 16.
Posted Date
Jan 6, 2026
Due Date
Feb 5, 2026
Release: Jan 6, 2026
Close: Feb 5, 2026
Procurement for the construction and installation of a new traffic signal system, including signal poles, signal heads, controller, video detection, conduit, cabling, luminaires, and pavement markings at the intersection of US Highway 31 and Shelby County Highway 16.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
IDOT is soliciting bids for bridge repairs and joint replacement on structure number 052-0068 carrying IL 251 over Bureau Creek, located 0.80 miles north of the Lee County line. The work includes bridge repair and joint replacement with associated traffic control and other incidental construction as indicated by the pay items. The project is advertised for the January 16, 2026 letting and is a District 2, Region 2 highway contract in Lee County, Illinois.
Posted Date
-
Due Date
Jan 16, 2026
Close: Jan 16, 2026
IDOT is soliciting bids for bridge repairs and joint replacement on structure number 052-0068 carrying IL 251 over Bureau Creek, located 0.80 miles north of the Lee County line. The work includes bridge repair and joint replacement with associated traffic control and other incidental construction as indicated by the pay items. The project is advertised for the January 16, 2026 letting and is a District 2, Region 2 highway contract in Lee County, Illinois.
AvailableIDOT Region 5, District 9 is soliciting bids for 6.8 miles of resurfacing and ADA ramp improvements along US 51 in Perry County, from 0.2 miles north of IL 154 to Raven Road. The contract duration is 50 working days and is part of the January 16, 2026 letting scheduled for 12:00 PM. Plans and Special Provisions have not yet been posted; the project was previously advertised on November 7, 2025.
Posted Date
Nov 18, 2025
Due Date
Jan 16, 2026
Release: Nov 18, 2025
Close: Jan 16, 2026
IDOT Region 5, District 9 is soliciting bids for 6.8 miles of resurfacing and ADA ramp improvements along US 51 in Perry County, from 0.2 miles north of IL 154 to Raven Road. The contract duration is 50 working days and is part of the January 16, 2026 letting scheduled for 12:00 PM. Plans and Special Provisions have not yet been posted; the project was previously advertised on November 7, 2025.
AvailableLinear highway striping throughout the County Highway System using truck mounted automated equipment. Includes edge line and centerline striping of various widths in yellow, white, or black latex or polyurea paint of various patterns. Project quantities include one application for each of two years for latex paint. Project quantities include one application for polyurea paint. Also includes packaged paint pails and bagged glass beads to be supplied and delivered to WCDOT.
Posted Date
Jan 1, 2026
Due Date
Jan 21, 2026
Release: Jan 1, 2026
Close: Jan 21, 2026
Linear highway striping throughout the County Highway System using truck mounted automated equipment. Includes edge line and centerline striping of various widths in yellow, white, or black latex or polyurea paint of various patterns. Project quantities include one application for each of two years for latex paint. Project quantities include one application for polyurea paint. Also includes packaged paint pails and bagged glass beads to be supplied and delivered to WCDOT.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →