Discover Opportunities months before the RFP drops
Learn more →Retrieving contract details... Hang tight!
See what competitors charge and their contract structure
Spot renewal opportunities 6-12 months before expiration
Analyze buyer's purchasing history and vendor preferences
Track expiration dates across all your target accounts
Reach decision-makers before renewal with competitive intel
Our customers win 3x more contract renewals and replacements
Verified decision-maker contacts
Winning vendor information
Budget & renewal data
Clean & enrich your CRM automatically
Track contract spending & renewal dates
Analyze historical pricing trends
Identify upcoming opportunities
Get complete source documentation & analysis
Department of Defense
This contract includes 1 purchase order from Aug 23, 2024 to Aug 23, 2024
| Buyer | Vendor | Issued Date | Quantity |
|---|---|---|---|
| Department of Defense | Gemini Technical Services JV LLC | Aug 23, 2024 | 1 |
Full Purchase Intelligence Available
Get complete pricing, descriptions, and financial details for all 1 purchase orders
Unlock Full Details →See what competitors charge and their contract structure
Spot renewal opportunities 6-12 months before expiration
Analyze buyer's purchasing history and vendor preferences
Track expiration dates across all your target accounts
Reach decision-makers before renewal with competitive intel
Our customers win 3x more contract renewals and replacements
No public files available for this contract.
Contract documentation may be available through official government sources or agency portals. Starbridge can help you track down and retrieve these files.
NASA Goddard Space Flight Center
UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY. THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE 3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS 7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
Effective Date
Nov 22, 2017
Expires
Effective: Nov 22, 2017
NASA Goddard Space Flight Center
Expires:
UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY. THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE 3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS 7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
ActiveNASA Goddard Space Flight Center
IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS.
Effective Date
Mar 23, 2017
Expires
Effective: Mar 23, 2017
NASA Goddard Space Flight Center
Expires:
IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS.
ActiveSee who's winning contracts, track spending trends, and identify your best opportunities before your competition.
Schedule Your Demo →Verified decision-maker contacts
Winning vendor information
Budget & renewal data
Clean & enrich your CRM automatically
Track contract spending & renewal dates
Analyze historical pricing trends
Identify upcoming opportunities
Get complete source documentation & analysis
NASA Goddard Space Flight Center
THE ATMOSPHERIC WAVES EXPERIMENT (AWE) IS PROPOSED BY THE UTAH STATE UNIVERSITY RESEARCH FOUNDATION (USURF) IN RESPONSE TO NASAS 2016 HELIOPHYSICS EXPLORERS MISSION OF OPPORTUNITY ANNOUNCEMENT NNH12ZDA005O-HPEXMO. THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY USURF DURING THE PHASE A (AWE) CONCEPT STUDIES. USURF SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE AWE PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE. 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED AWE INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE AWE INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE AWE SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS.USURF SHALL PROVIDE A BRIEFING ON THE AWE SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. USURF SHALL PROVIDE AN ORGANIZATION CHART DEFINING USURF ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE USURF PI PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE.. USURF SHALL DEVELOP A AWE INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A AWE MISSION SYSTEMS REQUIREMENTS DOCUMENT. USURF SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. USURF SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. USURF SHALL LEAD THE SCIENCE TEAM. USURF SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST.
Effective Date
Feb 23, 2018
Expires
Effective: Feb 23, 2018
NASA Goddard Space Flight Center
Expires:
THE ATMOSPHERIC WAVES EXPERIMENT (AWE) IS PROPOSED BY THE UTAH STATE UNIVERSITY RESEARCH FOUNDATION (USURF) IN RESPONSE TO NASAS 2016 HELIOPHYSICS EXPLORERS MISSION OF OPPORTUNITY ANNOUNCEMENT NNH12ZDA005O-HPEXMO. THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY USURF DURING THE PHASE A (AWE) CONCEPT STUDIES. USURF SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE AWE PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE. 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED AWE INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE AWE INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE AWE SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS.USURF SHALL PROVIDE A BRIEFING ON THE AWE SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. USURF SHALL PROVIDE AN ORGANIZATION CHART DEFINING USURF ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE USURF PI PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE.. USURF SHALL DEVELOP A AWE INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A AWE MISSION SYSTEMS REQUIREMENTS DOCUMENT. USURF SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. USURF SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. USURF SHALL LEAD THE SCIENCE TEAM. USURF SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST.
ActiveNASA Goddard Space Flight Center
THE SUN RADIO INTERFEROMETER SPACE EXPERIMENT (SUNRISE) IS PROPOSED BY UNIVERSITY OF MICHIGAN (UM) IN RESPONSE TO NASA'S 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY. THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY UM DURING THE PHASE A (SUNRISE) PROJECT. UM SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE SUNRISE PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE. 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED SUNRISE INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE SUNRISE INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE SUNRISE SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. UM SHALL PROVIDE A BRIEFING ON THE SUNRISE SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. UM SHALL PROVIDE AN ORGANIZATION CHART DEFINING UM ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE UM PI PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE.. UM SHALL DEVELOP A SUNRISE INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A SUNRISE MISSION SYSTEMS REQUIREMENTS DOCUMENT. UM SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. UM SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. UM SHALL LEAD THE SCIENCE TEAM. UM SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. UM SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES.
Effective Date
Feb 12, 2018
Expires
Effective: Feb 12, 2018
NASA Goddard Space Flight Center
Expires:
THE SUN RADIO INTERFEROMETER SPACE EXPERIMENT (SUNRISE) IS PROPOSED BY UNIVERSITY OF MICHIGAN (UM) IN RESPONSE TO NASA'S 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY. THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY UM DURING THE PHASE A (SUNRISE) PROJECT. UM SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE SUNRISE PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE. 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED SUNRISE INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE SUNRISE INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE SUNRISE SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. UM SHALL PROVIDE A BRIEFING ON THE SUNRISE SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. UM SHALL PROVIDE AN ORGANIZATION CHART DEFINING UM ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE UM PI PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE.. UM SHALL DEVELOP A SUNRISE INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A SUNRISE MISSION SYSTEMS REQUIREMENTS DOCUMENT. UM SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. UM SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. UM SHALL LEAD THE SCIENCE TEAM. UM SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. UM SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES.
Active