Retrieving contract details... Hang tight!
Effective Date
Jun 27, 2024
Expiration Date
Mar 10, 2031
| Description | Buyer | Seller | Issued Date | Quantity | Unit Price | Annual Fee |
|---|---|---|---|---|---|---|
| NASA Goddard Space Flight Center | Raytheon Company | Jun 27, 2024 | 1 |
NASA Goddard Space Flight Center
NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
NASA Goddard Space Flight Center
PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR.
NASA Goddard Space Flight Center
THE MIST II CONTRACT WILL PROVIDE MULTIDISCIPLINARY ENGINEERING TASK ORDERS FOR THE FORMULATION, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT AND GROUND SYSTEM HARDWARE AND SOFTWARE.