Discover Opportunities months before the RFP drops
Learn more →Project consists of the installation of a new utility-to-utility water meter connection including meter vault, meter, valving, bypass piping and approx 870 LF of 12" dip.
Posted Date
Nov 17, 2025
Due Date
Dec 18, 2025
Release: Nov 17, 2025
Close: Dec 18, 2025
Project consists of the installation of a new utility-to-utility water meter connection including meter vault, meter, valving, bypass piping and approx 870 LF of 12" dip.
AvailableConstruction of a new booster pump station, including installation of pumps with VFDs, a paved driveway, parking area, 750 feet of water line, and erosion control facilities.
Posted Date
Sep 19, 2024
Due Date
Oct 15, 2024
Release: Sep 19, 2024
Close: Oct 15, 2024
Construction of a new booster pump station, including installation of pumps with VFDs, a paved driveway, parking area, 750 feet of water line, and erosion control facilities.
Provide professional engineering services from qualified professional engineers demonstrating their qualifications for planning, design, bidding, and construction management for the construction of a 7.5 mg clearwell.
Posted Date
Jul 25, 2024
Due Date
Aug 28, 2024
Release: Jul 25, 2024
Close: Aug 28, 2024
Provide professional engineering services from qualified professional engineers demonstrating their qualifications for planning, design, bidding, and construction management for the construction of a 7.5 mg clearwell.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis