Discover Opportunities months before the RFP drops
Learn more →Provide dark or lit fiber telecommunications services for the District. A ring or hybrid architecture is preferred utilizing the High School as the HUB location. See attached file.
Posted Date
Nov 18, 2025
Due Date
Dec 22, 2025
Release: Nov 18, 2025
Close: Dec 22, 2025
Provide dark or lit fiber telecommunications services for the District. A ring or hybrid architecture is preferred utilizing the High School as the HUB location. See attached file.
AvailableThe district needs to add between 4 and 7 parking spaces to the back of the building. Work includes: Tree removal (may not apply), removal of existing sidewalks and curbs, excavation (10"), sub-base (geotextile, 6"2A limestone), asphalt paving (2 1/2" binder/ 1 1/2" wearing), repair 4" concrete walk, 6" x 8" concrete deck curb, parking bumpers, line stripping, foundation opening grill, grass restoration. See attached file.
Posted Date
Nov 3, 2025
Due Date
Nov 17, 2025
Release: Nov 3, 2025
Close: Nov 17, 2025
The district needs to add between 4 and 7 parking spaces to the back of the building. Work includes: Tree removal (may not apply), removal of existing sidewalks and curbs, excavation (10"), sub-base (geotextile, 6"2A limestone), asphalt paving (2 1/2" binder/ 1 1/2" wearing), repair 4" concrete walk, 6" x 8" concrete deck curb, parking bumpers, line stripping, foundation opening grill, grass restoration. See attached file.
The district needs to add between 4 and 7 parking spaces to the back of the building: Tree removal ( may not apply), Removal of existing sidewalks and curbs, Excavation (10"), Sub-base (Geotextile, 6"2A limestone), Asphalt paving (2 1/2" binder/ 1 1/2" wearing), Repair 4" concrete walk, 6" x 8" concrete deck curb, Parking bumpers, Line stripping, Foundation opening grill, Grass restoration.
Posted Date
Jul 3, 2025
Due Date
Jul 17, 2025
Release: Jul 3, 2025
Close: Jul 17, 2025
The district needs to add between 4 and 7 parking spaces to the back of the building: Tree removal ( may not apply), Removal of existing sidewalks and curbs, Excavation (10"), Sub-base (Geotextile, 6"2A limestone), Asphalt paving (2 1/2" binder/ 1 1/2" wearing), Repair 4" concrete walk, 6" x 8" concrete deck curb, Parking bumpers, Line stripping, Foundation opening grill, Grass restoration.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis