Discover Opportunities months before the RFP drops
Learn more →New Clubhouse Building.
Posted Date
Nov 18, 2025
Due Date
Dec 18, 2025
Release: Nov 18, 2025
Close: Dec 18, 2025
New Clubhouse Building.
AvailableWork includes 1 LS of demolition and removal of 2 existing 24" CI culvert pipes, 1 LS of remove existing 8" waterline, 62 furnish and install new 8" double cement lined DI waterline, 2 EA of furnish and install new 8" gate valve, 1 LS of furnish and install new precast reinforced concrete culvert, 1 LS of furnish and install r-5 stone rip rap choked, 290 SY of 2" depth 19mm superpave HMA bit. Concrete binder course temporary pavement, 290 SY of 6" depth penndot 2a stone roadway subbase, 290 SY of 3" depth 19mm superpave HMA bituminous concrete base course, 300 LF of Furnish and install new Type 2-S guide rail. See attached file.
Posted Date
Feb 13, 2025
Due Date
Mar 7, 2025
Release: Feb 13, 2025
Close: Mar 7, 2025
Work includes 1 LS of demolition and removal of 2 existing 24" CI culvert pipes, 1 LS of remove existing 8" waterline, 62 furnish and install new 8" double cement lined DI waterline, 2 EA of furnish and install new 8" gate valve, 1 LS of furnish and install new precast reinforced concrete culvert, 1 LS of furnish and install r-5 stone rip rap choked, 290 SY of 2" depth 19mm superpave HMA bit. Concrete binder course temporary pavement, 290 SY of 6" depth penndot 2a stone roadway subbase, 290 SY of 3" depth 19mm superpave HMA bituminous concrete base course, 300 LF of Furnish and install new Type 2-S guide rail. See attached file.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis