Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 1 LS of demolition and removal of 2 existing 24" CI culvert pipes, 1 LS of remove existing 8" waterline, 62 furnish and install new 8" double cement lined DI waterline, 2 EA of furnish and install new 8" gate valve, 1 LS of furnish and install new precast reinforced concrete culvert, 1 LS of furnish and install r-5 stone rip rap choked, 290 SY of 2" depth 19mm superpave HMA bit. Concrete binder course temporary pavement, 290 SY of 6" depth penndot 2a stone roadway subbase, 290 SY of 3" depth 19mm superpave HMA bituminous concrete base course, 300 LF of Furnish and install new Type 2-S guide rail. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Culvert replacements.
Posted Date
-
Due Date
Dec 18, 2025
Release: -
Close: Dec 18, 2025
Culvert replacements.
AvailableCulvert replacements & rehabilitations.
Posted Date
-
Due Date
Jan 8, 2026
Close: Jan 8, 2026
Culvert replacements & rehabilitations.
AvailableProject involves the construction of improvements to Griffith Lake Dam located in Kent and Sussex Counties. The improvements include, but are not limited to _Demolition/removal of the existing spillway and the north and south abutment training walls; construction of new pile supported cast-in-place concrete spillway, runout apron, outlet structure and abutment walls; installation of a galvanized steel bar screen trash rack and a multi-leaf self-contained stainless steel weir gate and associated site work.
Posted Date
Nov 10, 2025
Due Date
Jan 21, 2026
Release: Nov 10, 2025
Close: Jan 21, 2026
Project involves the construction of improvements to Griffith Lake Dam located in Kent and Sussex Counties. The improvements include, but are not limited to _Demolition/removal of the existing spillway and the north and south abutment training walls; construction of new pile supported cast-in-place concrete spillway, runout apron, outlet structure and abutment walls; installation of a galvanized steel bar screen trash rack and a multi-leaf self-contained stainless steel weir gate and associated site work.
State Project No. 2026-089-8F129 This Project is Targeted Group (TG) Economically Disadvantaged (ED) Veteran-Owned preference. A.The work will be completed under one prime contract. B.The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract; Excavation and demolition of existing culvert structures; Stream restoration work involving natural materials and vegetation establishment; Fabricate, furnish, and install Aluminum Box Culvert Structure.; Erosion control, sediment control, and permanent vegetation establishment; Traffic control and permanent signage. See outside link.
Posted Date
Aug 21, 2025
Due Date
Sep 10, 2026
Release: Aug 21, 2025
Close: Sep 10, 2026
State Project No. 2026-089-8F129 This Project is Targeted Group (TG) Economically Disadvantaged (ED) Veteran-Owned preference. A.The work will be completed under one prime contract. B.The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract; Excavation and demolition of existing culvert structures; Stream restoration work involving natural materials and vegetation establishment; Fabricate, furnish, and install Aluminum Box Culvert Structure.; Erosion control, sediment control, and permanent vegetation establishment; Traffic control and permanent signage. See outside link.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis