Discover Opportunities months before the RFP drops
Learn more →Work to be performed under this Contract includes demolition and disposal of the existing 2-million-gallon abovegrade welded steel water storage tank, followed by construction of a new AWWA D110, Type III wire-wound, prestressed concrete water storage tank. The new tank will have an inside diameter of 119' and a high-water depth of 36', providing a total capacity of 3 million gallons. Construction of the new tank will include demolition of existing infrastructure, modifications to existing utilities, installation of new water lines and valves, and all associated earthwork.
Posted Date
Dec 8, 2025
Due Date
Jan 16, 2026
Release: Dec 8, 2025
Close: Jan 16, 2026
Work to be performed under this Contract includes demolition and disposal of the existing 2-million-gallon abovegrade welded steel water storage tank, followed by construction of a new AWWA D110, Type III wire-wound, prestressed concrete water storage tank. The new tank will have an inside diameter of 119' and a high-water depth of 36', providing a total capacity of 3 million gallons. Construction of the new tank will include demolition of existing infrastructure, modifications to existing utilities, installation of new water lines and valves, and all associated earthwork.
AvailablePre-engineered hail protection/shade structures.
Posted Date
Jan 29, 2025
Due Date
Mar 14, 2025
Release: Jan 29, 2025
Close: Mar 14, 2025
Pre-engineered hail protection/shade structures.
Release: Oct 29, 2024
Close: Jan 3, 2025
CMMS Software.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis