Learn more →DESIGN BUILD contract is end-of-lifecycle replacement of four (4) banks of 525-kV series capacitors installed at four (4) substation. he Contractor will engineer, procure, and construct (EPC) by removing and replacing the existing series capacitor banks with new and in-kind series capacitor banks (no changes to series capacitor size, rating, segmentation, and line compensation level).
Posted Date
Nov 25, 2025
Due Date
Dec 15, 2025
Release: Nov 25, 2025
Close: Dec 15, 2025
DESIGN BUILD contract is end-of-lifecycle replacement of four (4) banks of 525-kV series capacitors installed at four (4) substation. he Contractor will engineer, procure, and construct (EPC) by removing and replacing the existing series capacitor banks with new and in-kind series capacitor banks (no changes to series capacitor size, rating, segmentation, and line compensation level).
AvailableProvide manta relay test sets. MTS-5100 Protective Relay Test System (Quantity 6 EA.). All-in-one protective relay tester with direct, front panel interface for all functions with exceptional productivity-boosting features including intelligent multi-phase adjustment, specific relay test modes, and graphical phasor display. Includes 4-phase AC/ DC voltages, high VA 6-phase AC currents, contact/voltage inputs, contact outputs, analog transducer inputs, sequence of events recording, waveform capture capability and GPS receiver. Performs semi-automated testing, transient waveform playback, and end-to-end testing proficiently without a PC.
Posted Date
Sep 18, 2025
Due Date
Sep 24, 2025
Release: Sep 18, 2025
Close: Sep 24, 2025
Provide manta relay test sets. MTS-5100 Protective Relay Test System (Quantity 6 EA.). All-in-one protective relay tester with direct, front panel interface for all functions with exceptional productivity-boosting features including intelligent multi-phase adjustment, specific relay test modes, and graphical phasor display. Includes 4-phase AC/ DC voltages, high VA 6-phase AC currents, contact/voltage inputs, contact outputs, analog transducer inputs, sequence of events recording, waveform capture capability and GPS receiver. Performs semi-automated testing, transient waveform playback, and end-to-end testing proficiently without a PC.
To procure materials, supplies, tools, labor, management, supervision, and travel, required for S&C Electric Fused Disconnect Switch and Fuses
Posted Date
Sep 4, 2025
Due Date
Sep 15, 2025
Release: Sep 4, 2025
Close: Sep 15, 2025
To procure materials, supplies, tools, labor, management, supervision, and travel, required for S&C Electric Fused Disconnect Switch and Fuses
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis