Discover Opportunities months before the RFP drops
Learn more →Transformer for the new academic complex.
Posted Date
Oct 22, 2025
Due Date
Nov 4, 2025
Release: Oct 22, 2025
Close: Nov 4, 2025
Transformer for the new academic complex.
Final cleaning, Field engineering, Masonry (sitework), Site railings, Millwork, Air barriers, Metal panels, Roofing, Intumescent coatings, Doors/frames and hardware, Drywall, Tile, Marble wainscoting/panels, Acoustical ceilings, Resilient flooring/carpet, Terrazzo, Access flooring, Acoustical wall panels, Painting, Division 10 specialties, Signage, Countertops, Window treatments, Earthwork, Asphalt paving, Site concrete, Landscaping, Hardscaping, and Site Utilities. See outside link.
Posted Date
-
Due Date
Oct 29, 2025
Close: Oct 29, 2025
Final cleaning, Field engineering, Masonry (sitework), Site railings, Millwork, Air barriers, Metal panels, Roofing, Intumescent coatings, Doors/frames and hardware, Drywall, Tile, Marble wainscoting/panels, Acoustical ceilings, Resilient flooring/carpet, Terrazzo, Access flooring, Acoustical wall panels, Painting, Division 10 specialties, Signage, Countertops, Window treatments, Earthwork, Asphalt paving, Site concrete, Landscaping, Hardscaping, and Site Utilities. See outside link.
Work includes complete interior demolition, structural modification, and renovation to create modern classrooms, student collaboration spaces, a new 3-story interior atrium, and faculty offices. New fire protection, plumbing, mechanical, and electrical systems will be provided as part of the renovation. Building enclosure modifications and upgrades will also be completed including a new entrance at the rear of the building (hilltop side), roofing replacement, window replacement, masonry restoration & cleaning, and foundation waterproofing replacement. The courtyard will be reconfigured to provide new outdoor spaces.
Posted Date
Aug 7, 2025
Due Date
Sep 11, 2025
Release: Aug 7, 2025
Close: Sep 11, 2025
Work includes complete interior demolition, structural modification, and renovation to create modern classrooms, student collaboration spaces, a new 3-story interior atrium, and faculty offices. New fire protection, plumbing, mechanical, and electrical systems will be provided as part of the renovation. Building enclosure modifications and upgrades will also be completed including a new entrance at the rear of the building (hilltop side), roofing replacement, window replacement, masonry restoration & cleaning, and foundation waterproofing replacement. The courtyard will be reconfigured to provide new outdoor spaces.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis