Discover Opportunities months before the RFP drops
Learn more →The Weber Basin Water Conservancy District is requesting Statements of Qualification from professional engineering firms for the Davis Aqueduct Parallel Pipeline Reach 2 Project. The scope includes planning, conceptual design, final design, and bidding services for an overflow pipe to North Fork Kays Creek and a pipeline connection to the existing Davis Aqueduct.
Posted Date
Nov 13, 2025
Due Date
Dec 18, 2025
Release: Nov 13, 2025
Close: Dec 18, 2025
The Weber Basin Water Conservancy District is requesting Statements of Qualification from professional engineering firms for the Davis Aqueduct Parallel Pipeline Reach 2 Project. The scope includes planning, conceptual design, final design, and bidding services for an overflow pipe to North Fork Kays Creek and a pipeline connection to the existing Davis Aqueduct.
AvailableProject consist of approx 5,440 LF of 6" DR14 PVC C900 water line; 106 EA of 1" Single service lateral; 4,235 SY of 3" thick of Hot Mix Asphalt. See outside link.
Posted Date
Oct 8, 2025
Due Date
Oct 23, 2025
Release: Oct 8, 2025
Close: Oct 23, 2025
Project consist of approx 5,440 LF of 6" DR14 PVC C900 water line; 106 EA of 1" Single service lateral; 4,235 SY of 3" thick of Hot Mix Asphalt. See outside link.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis