Discover Opportunities months before the RFP drops
Learn more →Invitation for subcontractor and supplier bids for the Village of Fort Edward Water System Improvements with a 20% MWBE participation goal; the scope includes construction on highways and roadways, maintenance, repair, and new construction. Electronic plans and specifications are provided via the bid source and subcontractors must register with the NYSDOL Bureau of Public Works Labor Law 220-I Contractor Registry prior to bidding; bids are due 2025-12-26.
Posted Date
Nov 18, 2025
Due Date
Dec 26, 2025
Release: Nov 18, 2025
Close: Dec 26, 2025
Invitation for subcontractor and supplier bids for the Village of Fort Edward Water System Improvements with a 20% MWBE participation goal; the scope includes construction on highways and roadways, maintenance, repair, and new construction. Electronic plans and specifications are provided via the bid source and subcontractors must register with the NYSDOL Bureau of Public Works Labor Law 220-I Contractor Registry prior to bidding; bids are due 2025-12-26.
AvailableWater system improvements: replacement of water storage tank & upgrade to booster pump station: Contract 1 – General Construction: Furnish and install a new 200,000-gallon nominal pedesphere water storage tank, including but not limited to: site preparation and grading; installation of the concrete tank foundation; furnishing and installing inlet/outlet piping and a new water main to the tank; installation of a tank mixer, level transducer, cathodic protection system, lightning protection system, tank accessories and appurtenances, construction of a gravel access road, chain link fence and gate, and all associated site improvements. The tank shall be filled, disinfected, and tested in accordance with project specifications. Following successful commissioning of the new tank, the existing water storage tank shall be decommissioned and demolished as part of this contract. Work also includes modifications and upgrades to the existing booster pump station (excluding electrical work); Contract 2 – Electrical Construction: Furnish and install all electrical work associated with the new 200,000-gallon pedesphere water storage tank and modifications to the existing booster pump station. Work includes, but is not limited to: electrical service to tank, electrical conduits and wiring for tank mixer, level transducer, cathodic protection system, lightning protection system, and exterior and interior tank lighting; electrical connections and modifications associated with booster pump station upgrades; integration of SCADA control components and instrumentation for remote monitoring and control of the new tank and booster pump station; coordination with General construction Contractor for equipment installation; and all testing, calibration, and commissioning required to deliver a fully functional and integrated electrical and control system.
Posted Date
Oct 29, 2025
Due Date
Dec 4, 2025
Release: Oct 29, 2025
Close: Dec 4, 2025
Water system improvements: replacement of water storage tank & upgrade to booster pump station: Contract 1 – General Construction: Furnish and install a new 200,000-gallon nominal pedesphere water storage tank, including but not limited to: site preparation and grading; installation of the concrete tank foundation; furnishing and installing inlet/outlet piping and a new water main to the tank; installation of a tank mixer, level transducer, cathodic protection system, lightning protection system, tank accessories and appurtenances, construction of a gravel access road, chain link fence and gate, and all associated site improvements. The tank shall be filled, disinfected, and tested in accordance with project specifications. Following successful commissioning of the new tank, the existing water storage tank shall be decommissioned and demolished as part of this contract. Work also includes modifications and upgrades to the existing booster pump station (excluding electrical work); Contract 2 – Electrical Construction: Furnish and install all electrical work associated with the new 200,000-gallon pedesphere water storage tank and modifications to the existing booster pump station. Work includes, but is not limited to: electrical service to tank, electrical conduits and wiring for tank mixer, level transducer, cathodic protection system, lightning protection system, and exterior and interior tank lighting; electrical connections and modifications associated with booster pump station upgrades; integration of SCADA control components and instrumentation for remote monitoring and control of the new tank and booster pump station; coordination with General construction Contractor for equipment installation; and all testing, calibration, and commissioning required to deliver a fully functional and integrated electrical and control system.
Provide admin and engineering services for the (2) vacant and blighted properties within the village for demolition.
Posted Date
Apr 10, 2025
Due Date
May 9, 2025
Release: Apr 10, 2025
Close: May 9, 2025
Provide admin and engineering services for the (2) vacant and blighted properties within the village for demolition.
Premium
Access the largest public sector contact database
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis