Discover Opportunities months before the RFP drops
Learn more →The Village of Estero seeks bids for ditch and swale cleaning and maintenance services at multiple locations, including mowing, vegetation removal, sediment control, and erosion/pollution prevention measures. The contract is expected to start April 1, 2026 for one year with three optional one-year renewals.
Posted Date
Nov 3, 2025
Due Date
Dec 15, 2025
Release: Nov 3, 2025
Close: Dec 15, 2025
The Village of Estero seeks bids for ditch and swale cleaning and maintenance services at multiple locations, including mowing, vegetation removal, sediment control, and erosion/pollution prevention measures. The contract is expected to start April 1, 2026 for one year with three optional one-year renewals.
AvailableProject consists of ground up construction of a 44,000 SF entertainment facility on a 4.2 AC site as part of a larger sports development complex. See outside link.
Posted Date
Sep 8, 2025
Due Date
Oct 10, 2025
Release: Sep 8, 2025
Close: Oct 10, 2025
Project consists of ground up construction of a 44,000 SF entertainment facility on a 4.2 AC site as part of a larger sports development complex. See outside link.
Right of way & topographic survey: establish existing right of way limits; topographic survey of existing right of way and adjacent properties; sketch & legal descriptions of additional right of way/easements needs. Traffic, bicycle & pedestrian study: study existing traffic conditions & safety; study existing bicycle & pedestrian conditions; identify areas of needed improvements; provide recommendations to improve traffic flow and safety. Stormwater management system design: study existing conditions to understand local and regional stormwater flows; identify areas of known flooding; prepare an existing conditions model to confirm areas of flooding and provide a basis for comparison to proposed improvements. See outside link.
Posted Date
Jun 6, 2025
Due Date
Aug 11, 2025
Release: Jun 6, 2025
Close: Aug 11, 2025
Right of way & topographic survey: establish existing right of way limits; topographic survey of existing right of way and adjacent properties; sketch & legal descriptions of additional right of way/easements needs. Traffic, bicycle & pedestrian study: study existing traffic conditions & safety; study existing bicycle & pedestrian conditions; identify areas of needed improvements; provide recommendations to improve traffic flow and safety. Stormwater management system design: study existing conditions to understand local and regional stormwater flows; identify areas of known flooding; prepare an existing conditions model to confirm areas of flooding and provide a basis for comparison to proposed improvements. See outside link.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis