Discover Opportunities months before the RFP drops
Learn more →Installation of a storm chamber system that will provide a total stormwater volume of 7,159 CF t with a total system area of 5,773 square feet. The system shall be equivalent to or greater than the SC310 StormTech Chamber systems details included in the plans. Work at this location includes eleven drainage structures and covers, storm sewer piping, stone riprap, trail stone removal/placement, concrete curb, hot-mix asphalt pavement, boardwalk removal/reset, excavation, backfill stone, and site restoration.
Posted Date
Jan 7, 2025
Due Date
Jan 30, 2025
Release: Jan 7, 2025
Close: Jan 30, 2025
Installation of a storm chamber system that will provide a total stormwater volume of 7,159 CF t with a total system area of 5,773 square feet. The system shall be equivalent to or greater than the SC310 StormTech Chamber systems details included in the plans. Work at this location includes eleven drainage structures and covers, storm sewer piping, stone riprap, trail stone removal/placement, concrete curb, hot-mix asphalt pavement, boardwalk removal/reset, excavation, backfill stone, and site restoration.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis