Discover Opportunities months before the RFP drops
Learn more →The Utah Department of Transportation (UDOT) requests proposals to provide a Toll Back Office System (BOS) and Customer Service Center (CSC) support to manage electronic toll collection account services for the Express Pass program. The contract is expected to be a single award covering development, transition, delivery, and ongoing operations including customer account management, CSC staffing, and system maintenance. The period of performance is five years with up to five one-year extensions; work will primarily be performed in Salt Lake City and surrounding areas of Utah.
Posted Date
Dec 10, 2025
Due Date
Jan 31, 2026
Release: Dec 10, 2025
Close: Jan 31, 2026
The Utah Department of Transportation (UDOT) requests proposals to provide a Toll Back Office System (BOS) and Customer Service Center (CSC) support to manage electronic toll collection account services for the Express Pass program. The contract is expected to be a single award covering development, transition, delivery, and ongoing operations including customer account management, CSC staffing, and system maintenance. The period of performance is five years with up to five one-year extensions; work will primarily be performed in Salt Lake City and surrounding areas of Utah.
AvailableAcquisition of an Express Lanes Back Office System (BOS) with a Customer Service Center (CSC) and related support services.
Posted Date
Dec 10, 2025
Due Date
Dec 31, 9999
Release: Dec 10, 2025
Close: Dec 31, 9999
Acquisition of an Express Lanes Back Office System (BOS) with a Customer Service Center (CSC) and related support services.
AvailableThe Utah Department of Transportation (UDOT) seeks a qualified consultant to provide preconstruction engineering (PE) services for the SR-39 Grade Separated Overpass project in Ogden, UT. The scope includes 30% preliminary engineering, NEPA environmental documentation, a Project Management Plan meeting FRA requirements, and multiple design disciplines (survey, roadway, structures, drainage, utilities, geotechnical). The procurement is a Qualifications-Based Selection (RFSQ/QBS) posted on Bonfire with proposals due January 15, 2026 and submissions managed through the UDOT Bonfire eProcurement platform.
Posted Date
Dec 9, 2025
Due Date
Jan 15, 2026
Release: Dec 9, 2025
Close: Jan 15, 2026
The Utah Department of Transportation (UDOT) seeks a qualified consultant to provide preconstruction engineering (PE) services for the SR-39 Grade Separated Overpass project in Ogden, UT. The scope includes 30% preliminary engineering, NEPA environmental documentation, a Project Management Plan meeting FRA requirements, and multiple design disciplines (survey, roadway, structures, drainage, utilities, geotechnical). The procurement is a Qualifications-Based Selection (RFSQ/QBS) posted on Bonfire with proposals due January 15, 2026 and submissions managed through the UDOT Bonfire eProcurement platform.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis