Discover Opportunities months before the RFP drops
Learn more →The University of Maryland Baltimore County (UMBC) is soliciting a controls integrator to design and implement a boiler plant control system for its High Temperature Hot Water (HTHW) system that integrates with existing Allen Bradley PLCs and provides a full graphics package at the CUP control room. The selected contractor will coordinate with the mechanical contractor for Project 24-123 and provide remote control capabilities for specified equipment. The solicitation includes mandatory pre-bid/site visits and requests proposals evaluated on technical response, past performance, personnel, and cost.
Posted Date
-
Due Date
Jan 16, 2026
Close: Jan 16, 2026
The University of Maryland Baltimore County (UMBC) is soliciting a controls integrator to design and implement a boiler plant control system for its High Temperature Hot Water (HTHW) system that integrates with existing Allen Bradley PLCs and provides a full graphics package at the CUP control room. The selected contractor will coordinate with the mechanical contractor for Project 24-123 and provide remote control capabilities for specified equipment. The solicitation includes mandatory pre-bid/site visits and requests proposals evaluated on technical response, past performance, personnel, and cost.
AvailableQualified proposals required from qualified contractors for the testing, maintenance, upgrade, and optimization of our existing water systems. These systems include the following type: heating and cooling water, cooling tower water, closed loop condenser water, glycol systems, and water softeners. This project involves conducting water quality testing and maintaining chemical balance in closed-loop heating and cooling water systems, cooling tower systems, make-up water systems, glycol systems and water softening systems to prevent scaling, corrosion, biological fouling, and freezing risks.
Posted Date
Aug 14, 2025
Due Date
Sep 11, 2025
Release: Aug 14, 2025
Close: Sep 11, 2025
Qualified proposals required from qualified contractors for the testing, maintenance, upgrade, and optimization of our existing water systems. These systems include the following type: heating and cooling water, cooling tower water, closed loop condenser water, glycol systems, and water softeners. This project involves conducting water quality testing and maintaining chemical balance in closed-loop heating and cooling water systems, cooling tower systems, make-up water systems, glycol systems and water softening systems to prevent scaling, corrosion, biological fouling, and freezing risks.
Project includes milling, patching, and resurfacing asphalt pavements.
Posted Date
Jul 8, 2025
Due Date
Aug 14, 2025
Release: Jul 8, 2025
Close: Aug 14, 2025
Project includes milling, patching, and resurfacing asphalt pavements.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis