Discover Opportunities months before the RFP drops
Learn more →Project scope includes replacing existing fire alarm system in its entirety with new voice evacuation fire alarm system. Existing fire alarm system shall be fully operational throughout all phases of construction. Demolish existing system once new system is installed, tested. Existing field device locations shall be reused whenever possible. Install new fire alarm system speaker as specified for voice evacuation. Portable buildings are included in scope.
Posted Date
Nov 25, 2025
Due Date
Dec 17, 2025
Release: Nov 25, 2025
Close: Dec 17, 2025
Project scope includes replacing existing fire alarm system in its entirety with new voice evacuation fire alarm system. Existing fire alarm system shall be fully operational throughout all phases of construction. Demolish existing system once new system is installed, tested. Existing field device locations shall be reused whenever possible. Install new fire alarm system speaker as specified for voice evacuation. Portable buildings are included in scope.
AvailableFire Riser Relocation.
Posted Date
Nov 25, 2025
Due Date
Jan 15, 2026
Release: Nov 25, 2025
Close: Jan 15, 2026
Fire Riser Relocation.
AvailableCommodity processing products for the 2026-2027 school year.
Posted Date
Nov 19, 2025
Due Date
Jan 5, 2026
Release: Nov 19, 2025
Close: Jan 5, 2026
Commodity processing products for the 2026-2027 school year.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis