Discover Opportunities months before the RFP drops
Learn more →Construction of approx. 0.5 miles of levee along the Gulf Intracoastal Waterway (GIWW) under the LA-317 bridge, tying into the existing ramp and drainage system. Work includes, but is not limited to: Raising the levee to an elevation of 10–15 ft NAVD88 using approx. 19,500 CY of borrow material Access road and haul route improvements Levee embankment construction Slope grading Ditch improvements Access ramp realignment Site clearing and grubbing Erosion control measures (silt fencing, etc.) Site preparation and compaction activities The project is intended to improve levee grade and stability while maintaining safe access to adjacent facilities.
Posted Date
Dec 5, 2025
Due Date
Jan 5, 2026
Release: Dec 5, 2025
Close: Jan 5, 2026
Construction of approx. 0.5 miles of levee along the Gulf Intracoastal Waterway (GIWW) under the LA-317 bridge, tying into the existing ramp and drainage system. Work includes, but is not limited to: Raising the levee to an elevation of 10–15 ft NAVD88 using approx. 19,500 CY of borrow material Access road and haul route improvements Levee embankment construction Slope grading Ditch improvements Access ramp realignment Site clearing and grubbing Erosion control measures (silt fencing, etc.) Site preparation and compaction activities The project is intended to improve levee grade and stability while maintaining safe access to adjacent facilities.
AvailableSpud barge CE 869 dry dock.
Posted Date
Nov 24, 2025
Due Date
Jan 5, 2026
Release: Nov 24, 2025
Close: Jan 5, 2026
Spud barge CE 869 dry dock.
AvailableForestry work (timber provide professional timber cruise services associated with easement acquisitions for the Atchafalaya Basin Floodway System (ABFS) project. The purpose of the timber cruises will be to assist the client agency in acquiring the easements authorized for the project. The contractor shall provide a determination of forest value, through professional timber evaluation services including a timber cruise and report detailing the current market value of the existing timber and any other information deemed necessary to produce a complete and credible report. The contractor shall also provide the forest value assuming harvesting restrictions imposed by the Government’s Flowage, Developmental Control, and Environmental Protection easement are in place (see attached draft easement).cruises).
Posted Date
Nov 24, 2025
Due Date
Dec 24, 2025
Release: Nov 24, 2025
Close: Dec 24, 2025
Forestry work (timber provide professional timber cruise services associated with easement acquisitions for the Atchafalaya Basin Floodway System (ABFS) project. The purpose of the timber cruises will be to assist the client agency in acquiring the easements authorized for the project. The contractor shall provide a determination of forest value, through professional timber evaluation services including a timber cruise and report detailing the current market value of the existing timber and any other information deemed necessary to produce a complete and credible report. The contractor shall also provide the forest value assuming harvesting restrictions imposed by the Government’s Flowage, Developmental Control, and Environmental Protection easement are in place (see attached draft easement).cruises).
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis