Discover Opportunities months before the RFP drops
Learn more →Work consists of construction of wastewater treatment facility (SRWWTF) filter and chlorine contact basin (CCB) cover structures (also called the filter and CCB structure project). The project will consist of the design and construction of two steel structures covering the Filters and the CCB.
Posted Date
Nov 5, 2025
Due Date
Dec 12, 2025
Release: Nov 5, 2025
Close: Dec 12, 2025
Work consists of construction of wastewater treatment facility (SRWWTF) filter and chlorine contact basin (CCB) cover structures (also called the filter and CCB structure project). The project will consist of the design and construction of two steel structures covering the Filters and the CCB.
Sewer Rehabilitation Project which will consist of the installation of approx 3,320 LF of cured-in-place pipe ranging from 6" to 15" diameter.
Posted Date
Feb 21, 2025
Due Date
Mar 13, 2025
Release: Feb 21, 2025
Close: Mar 13, 2025
Sewer Rehabilitation Project which will consist of the installation of approx 3,320 LF of cured-in-place pipe ranging from 6" to 15" diameter.
Provision of janitorial services.
Posted Date
Feb 12, 2025
Due Date
Apr 3, 2025
Release: Feb 12, 2025
Close: Apr 3, 2025
Provision of janitorial services.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium