Discover Opportunities months before the RFP drops
Learn more →Golf Road Parking Lot. Improvements include, but are not limited to, site demolition, asphalt pavement, concrete curb, concrete sidewalk, bollards, fencing, signage, pavement markings, and landscaping.
Posted Date
Sep 15, 2025
Due Date
Oct 7, 2025
Release: Sep 15, 2025
Close: Oct 7, 2025
Golf Road Parking Lot. Improvements include, but are not limited to, site demolition, asphalt pavement, concrete curb, concrete sidewalk, bollards, fencing, signage, pavement markings, and landscaping.
Work include 1,1625 SF demolish existing trial; 10 EA remove existing tres; 2,134 SY 6" penndot 2A stone subbase; 2,134 sy 12" wide asphalt walking trail;308 SF concrete pad; 260 SF 5' wide concrete walkway; 55 SF concrete sidewalk along e marshall road; 8 LF sawcut & remove existing curbing; 8lf depressed curbing; 4 EA removable bollard; 815 LF infiltration trench; 20 EA 205" caliper shade tree; 14 EA site lighting.
Posted Date
Aug 20, 2025
Due Date
Sep 8, 2025
Release: Aug 20, 2025
Close: Sep 8, 2025
Work include 1,1625 SF demolish existing trial; 10 EA remove existing tres; 2,134 SY 6" penndot 2A stone subbase; 2,134 sy 12" wide asphalt walking trail;308 SF concrete pad; 260 SF 5' wide concrete walkway; 55 SF concrete sidewalk along e marshall road; 8 LF sawcut & remove existing curbing; 8lf depressed curbing; 4 EA removable bollard; 815 LF infiltration trench; 20 EA 205" caliper shade tree; 14 EA site lighting.
11,625 SF demolish existing trail; 10 ea remove existing trees; 2,134 SY of 6" penndot 2A stone subbase; 2,134 SY of 12' wide asphalt walking trails; 308 SF concrete pad; 260 SF of 5' wide concrete walkway; 55 SF concrete sidewalk along a marshall road; 1 ea detectable wearing surface (DWS); 8 LF sawcut & remove existing curbing; 8 LF depressed curbing; 4 ea removable bollard; 815 LF infiltration trench (incl, pipe, clean stone & fabric); 20 ea 2-5" caliper share tree; 1 LF electrical conduit & junction boxes for site lighting.
Posted Date
Aug 20, 2025
Due Date
Sep 18, 2025
Release: Aug 20, 2025
Close: Sep 18, 2025
11,625 SF demolish existing trail; 10 ea remove existing trees; 2,134 SY of 6" penndot 2A stone subbase; 2,134 SY of 12' wide asphalt walking trails; 308 SF concrete pad; 260 SF of 5' wide concrete walkway; 55 SF concrete sidewalk along a marshall road; 1 ea detectable wearing surface (DWS); 8 LF sawcut & remove existing curbing; 8 LF depressed curbing; 4 ea removable bollard; 815 LF infiltration trench (incl, pipe, clean stone & fabric); 20 ea 2-5" caliper share tree; 1 LF electrical conduit & junction boxes for site lighting.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.