Learn more →The Sumneytown Pike (SR 0063) Signal System Upgrade Project.
Posted Date
Dec 1, 2025
Due Date
Dec 18, 2025
Release: Dec 1, 2025
Close: Dec 18, 2025
The Sumneytown Pike (SR 0063) Signal System Upgrade Project.
AvailableWork includes approx 1,012 LS 18" ductile iron pipe; 109 LF of 18" CIPP lining; 1 LS bypass pumping. See attached file.
Posted Date
Apr 8, 2025
Due Date
May 7, 2025
Release: Apr 8, 2025
Close: May 7, 2025
Work includes approx 1,012 LS 18" ductile iron pipe; 109 LF of 18" CIPP lining; 1 LS bypass pumping. See attached file.
The Contract will generally involve the replacement of 50 handicap ramps to meet ADA requirements, including 1,284 LF of concrete curb replacements, 7,800 SF of concrete sidewalk replacements, 385 LF concrete cheek wall and 406 SF detectable warning surface. The Contract will also involve property owner concrete replacements including 447.5 LF standard concrete curb, 1,126 LF concrete driveway depression, 2,246 SF concrete driveway apron and the disconnect of 2 EA sump pump lines through the curb.
Posted Date
Apr 2, 2025
Due Date
Apr 30, 2025
Release: Apr 2, 2025
Close: Apr 30, 2025
The Contract will generally involve the replacement of 50 handicap ramps to meet ADA requirements, including 1,284 LF of concrete curb replacements, 7,800 SF of concrete sidewalk replacements, 385 LF concrete cheek wall and 406 SF detectable warning surface. The Contract will also involve property owner concrete replacements including 447.5 LF standard concrete curb, 1,126 LF concrete driveway depression, 2,246 SF concrete driveway apron and the disconnect of 2 EA sump pump lines through the curb.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis