Discover Opportunities months before the RFP drops
Learn more →The Town of Welaka, Florida is soliciting sealed bids for the construction of the FDEP WWTF Expansion & Upgrades, including a new conventional wastewater treatment facility and related work. Bidding documents are available via the engineer’s plan room or at the issuing office, and bids are due December 16, 2025 at 3:00 pm local time.
Posted Date
Nov 15, 2025
Due Date
Dec 16, 2025
Release: Nov 15, 2025
Close: Dec 16, 2025
The Town of Welaka, Florida is soliciting sealed bids for the construction of the FDEP WWTF Expansion & Upgrades, including a new conventional wastewater treatment facility and related work. Bidding documents are available via the engineer’s plan room or at the issuing office, and bids are due December 16, 2025 at 3:00 pm local time.
AvailableWork includes construct a new 0.125 MGD conventional wastewater treatment facility (WWTF), which will include: concrete influent structure with static screen, cyclone grit removal, and flow splitting; two (2) 0.125 MGD ADF package biological treatment units (BTU No. 1) consisting of pre-anoxic, aeration, post-anoxic, re-aeration, clarification, and digester compartments each within a prestressed concrete tank; associated process pumps and blowers located outside the BTU tankage; two (2) disk-type filters in stainless steel tankage; chlorine contact chamber with two isolatable compartments constructed of poured-in-place concrete influent pump station modifications; in-plant reuse pump station; chemical feed and storage facilities; operations/control building;; modification of the existing on-site rapid infiltration basins (RIBs); yard piping; sitework; electrical/instrumentation and SCADA, including new emergency generator; associated restoration; and the demolition of the existing 0.100 MGD WWTF. Additive Alternates, which include additional WWTF upgrades and expanded treatment capacity via BTU No. 2, may be included in the project based on available budget.
Posted Date
Sep 3, 2025
Due Date
Dec 16, 2025
Release: Sep 3, 2025
Close: Dec 16, 2025
Work includes construct a new 0.125 MGD conventional wastewater treatment facility (WWTF), which will include: concrete influent structure with static screen, cyclone grit removal, and flow splitting; two (2) 0.125 MGD ADF package biological treatment units (BTU No. 1) consisting of pre-anoxic, aeration, post-anoxic, re-aeration, clarification, and digester compartments each within a prestressed concrete tank; associated process pumps and blowers located outside the BTU tankage; two (2) disk-type filters in stainless steel tankage; chlorine contact chamber with two isolatable compartments constructed of poured-in-place concrete influent pump station modifications; in-plant reuse pump station; chemical feed and storage facilities; operations/control building;; modification of the existing on-site rapid infiltration basins (RIBs); yard piping; sitework; electrical/instrumentation and SCADA, including new emergency generator; associated restoration; and the demolition of the existing 0.100 MGD WWTF. Additive Alternates, which include additional WWTF upgrades and expanded treatment capacity via BTU No. 2, may be included in the project based on available budget.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis