Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Welaka
Work includes construct a new 0.125 MGD conventional wastewater treatment facility (WWTF), which will include: concrete influent structure with static screen, cyclone grit removal, and flow splitting; two (2) 0.125 MGD ADF package biological treatment units (BTU No. 1) consisting of pre-anoxic, aeration, post-anoxic, re-aeration, clarification, and digester compartments each within a prestressed concrete tank; associated process pumps and blowers located outside the BTU tankage; two (2) disk-type filters in stainless steel tankage; chlorine contact chamber with two isolatable compartments constructed of poured-in-place concrete influent pump station modifications; in-plant reuse pump station; chemical feed and storage facilities; operations/control building;; modification of the existing on-site rapid infiltration basins (RIBs); yard piping; sitework; electrical/instrumentation and SCADA, including new emergency generator; associated restoration; and the demolition of the existing 0.100 MGD WWTF. Additive Alternates, which include additional WWTF upgrades and expanded treatment capacity via BTU No. 2, may be included in the project based on available budget.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Town of Welaka
The Town of Welaka, Florida is soliciting sealed bids for the construction of the FDEP WWTF Expansion & Upgrades, including a new conventional wastewater treatment facility and related work. Bidding documents are available via the engineer’s plan room or at the issuing office, and bids are due December 16, 2025 at 3:00 pm local time.
Posted Date
Nov 15, 2025
Due Date
Dec 16, 2025
Release: Nov 15, 2025
Town of Welaka
Close: Dec 16, 2025
The Town of Welaka, Florida is soliciting sealed bids for the construction of the FDEP WWTF Expansion & Upgrades, including a new conventional wastewater treatment facility and related work. Bidding documents are available via the engineer’s plan room or at the issuing office, and bids are due December 16, 2025 at 3:00 pm local time.
AvailableCity of Newberry
Wastewater treatment facility (WWTF) expansion.
Posted Date
Oct 23, 2025
Due Date
Dec 18, 2025
Release: Oct 23, 2025
City of Newberry
Close: Dec 18, 2025
Wastewater treatment facility (WWTF) expansion.
AvailableSouth Carolina Governor's School for the Arts and Humanities
The South Carolina Governor's School for the Arts and Humanities seeks bids to replace the existing generator serving the Kitchen Building; the existing 150KW generator will be abandoned in place. This solicitation is a rebid with modifications using Design-Bid-Build delivery and has an estimated construction cost of $150,000–$200,000.
Posted Date
Oct 31, 2025
Due Date
Dec 2, 2025
Release: Oct 31, 2025
South Carolina Governor's School for the Arts and Humanities
Close: Dec 2, 2025
The South Carolina Governor's School for the Arts and Humanities seeks bids to replace the existing generator serving the Kitchen Building; the existing 150KW generator will be abandoned in place. This solicitation is a rebid with modifications using Design-Bid-Build delivery and has an estimated construction cost of $150,000–$200,000.
AvailableBoone County Regional Sewer District
Base Bid consists of acquisition of aeration and gravel filter equipment for the village 2-cell wastewater lagoon. Alternates include replacement of the existing aeration system and installation of the filter, site fencing, repair of valve boxes, adjustment of the outfall pipe and installation of a flow meter.
Posted Date
Nov 11, 2025
Due Date
Dec 3, 2025
Release: Nov 11, 2025
Boone County Regional Sewer District
Close: Dec 3, 2025
Base Bid consists of acquisition of aeration and gravel filter equipment for the village 2-cell wastewater lagoon. Alternates include replacement of the existing aeration system and installation of the filter, site fencing, repair of valve boxes, adjustment of the outfall pipe and installation of a flow meter.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis